header-left
File #: 2400-2019    Version: 1
Type: Ordinance Status: Passed
File created: 9/10/2019 In control: Public Utilities Committee
On agenda: 11/4/2019 Final action: 11/7/2019
Title: To authorize the Director of Public Utilities to enter into a construction contract with General Temperature Control, Inc. for the JPWWTP Digester Control Building 1 HVAC and Air Purification Replacement Project, 650265-100101, Contract SCP 18JP; and to authorize an expenditure of up to $393,600.00 from the Sanitary Sewer General Obligation Bond Fund. ($393,600.00)
Attachments: 1. Ord 2400-2019 DAX Financial Form JP Digester CB1 HVAC & Air Pure Replc, 2. Ord 2400-2019 SWIF Utilization JP Digester CB1 HVAC & Air
Explanation

BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a construction contract with General Temperature Control, Inc. for the JPWWTP Digester Control Building 1 HVAC and Air Purification Replacement Project, 650265-100101, Contract SCP 18JP. The work for this project consists of the replacement of the computer room air conditioning system in the Digester Control Building 1 and other such work as may be necessary to complete the contract, in accordance with the drawings, technical specifications, and City of Columbus Construction and Material Specifications as set forth in this Invitation For Bid (IFB).

Planning area - 59 Southwest

PROJECT TIMELINE: Contract work shall be substantially complete within 150 calendar days of the Notice to Proceed, with final completion to occur within 180 calendar days. The City anticipates issuing a Notice to Proceed on or about November 27, 2019.

PROCUREMENT INFORMATION: The Division advertised for competitive bids for the subject services on the City's Vendor Services website and in the City Bulletin in accordance with the overall provisions of Section 329 of the Columbus City Code. The Division of Sewerage and Drainage received one (1) bid on September 4, 2019 from:

Vendor Name Compliance No. Exp. Date: Type City State
General Temperature Control, Inc. 31-1201236 11/20/20 MAJ Amanda OH

The bid was reviewed using the Bid Tab and Quality Factor Form (QFF) process. After the evaluation it was determined that General Temperature Control, Inc. met the project requirements.

EMERGENCY DESIGNATION: Emergency action is not requested at this time.

CONTRACT COMPLIANCE NO: 31-1201236 | MAJ | 11/20/20 | Vendor #004830

ECONOMIC / ENVIRONMENTAL IMPACT: Updating to a new HVAC unit will provide better energy efficiency, reduced heating cost, and prevent negative impacts from failure of the current units.

FISCAL IMPACT: This legislation authorizes an expenditure of up to...

Click here for full text