File #: 2781-2015    Version: 1
Type: Ordinance Status: Passed
File created: 11/1/2015 In control: Public Utilities Committee
On agenda: 3/21/2016 Final action: 3/24/2016
Title: To authorize the Director of Public Utilities to modify the professional engineering services agreement with Brown and Caldwell for the Blueprint Clintonville Cooke/Glenmont Project (Mod #2); to authorize the appropriation and transfer of $500,000.00 from the Sanitary Sewer Reserve Fund to the Sanitary Sewer General Obligation (G.O.) Bond Fund; to authorize the expenditure of up to $500,000.00 from the Sanitary Sewers General Obligation Bond Fund; and to amend the 2015 Capital Improvements Budget. ($500,000.00)
Attachments: 1. Ord 2781-2015 650870.5-Director's Legislation Info Sheet Mod #2, 2. Ord 2781-2015 SWIF 650870-5 Mod 2, 3. Ord 2781-2015 Legislative Template V2 650870-5 020516
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to modify the professional engineering agreement with Brown and Caldwell for the Blueprint Clintonville Cooke/Glenmont Project (Mod #2), CIP 650870-100005. It is the objective of the City to mitigate overflows of Designed Sewer Relief (DSR) 335 to the 10-year Level of Service (LOS). The City will evaluate and determine if this LOS is best achieved with strictly Inflow &Infiltration (I & I) elimination with Green Infrastrure (GI) or in combination with some gray infrastructure.

To accomplish this objective, the original scope of work for this project included all the requisite investigation, evaluation, formulation, and design to produce fully independent construction documents for the remediation of inflow and infiltration (I & I), green infrastructure (GI) technologies and other related activities and/or documents necessary for project completion.

This is a planned contract modification that provides funds to complete the tasks associated with bidding procurement, engineering services during construction, and record planning.

MODIFICATION INFORMATION
1.1 Amount of additional funds to be expended: $500,000.00
Original Contract Amount ($): $ 905,490.09
Modification #1: $ 365,000.00
Modification #2: (Current) $ 500,000.00
Total $1,770,490.09

1.2. Reasons additional goods/services could not be foreseen:
This was an anticipated modification. It is a planned continuation of the services originally included within the existing contract’s scope of service.

1.3. Reason other procurement processes are not used:
Re-bid of the project under the new requirements will likely result in a higher project costs as much of the project history would be lost and required to be rediscovered by another consultant unless won by the same consultant. In such a case, we would have wasted significant time in acquiring and evaluating the new proposals without significant bene...