File #: 0668-2007    Version: 1
Type: Ordinance Status: Passed
File created: 4/19/2007 In control: Utilities Committee
On agenda: 6/11/2007 Final action: 6/13/2007
Title: To authorize the Director of Public Utilities to modify the professional engineering services contract with URS Corporation for the Big Walnut Augmentation/Rickenbacker Interceptor Sewer Project; to authorize the appropriation and expenditure of $5,179,403.00 from the Ohio Water Pollution Control Loan Fund, and to amend the 2006 Capital Improvements Budget, for the Division of Sewerage and Drainage. ($5,179,403.00)
Attachments: 1. ORD0668-2007 MAP.pdf, 2. ORD0668-2007 Legislation Information Sheet.pdf, 3. ORD0668-2007 Modification Summary.pdf, 4. ORD0668-2007 URS Modification 6 Backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
6/13/20071 CITY CLERK Attest  Action details Meeting details
6/12/20071 MAYOR Signed  Action details Meeting details
6/11/20071 Columbus City Council ApprovedPass Action details Meeting details
6/11/20071 COUNCIL PRESIDENT Signed  Action details Meeting details
6/4/20071 Columbus City Council Read for the First Time  Action details Meeting details
5/16/20071 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
5/16/20071 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
5/15/20071 Utilities Drafter Sent for Approval  Action details Meeting details
5/14/20071 Auditor Drafter Sent for Approval  Action details Meeting details
5/14/20071 CITY AUDITOR Reviewed and Approved  Action details Meeting details
5/9/20071 Utilities Drafter Sent for Approval  Action details Meeting details
5/9/20071 Auditor Reviewer Reviewed and Approved  Action details Meeting details
5/7/20071 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
5/4/20071 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
5/3/20071 Utilities Drafter Sent for Approval  Action details Meeting details
5/2/20071 Finance Reviewer Reviewed and Approved  Action details Meeting details
5/2/20071 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
5/1/20071 Finance Reviewer Reviewed and Approved  Action details Meeting details
4/27/20071 Utilities Drafter Sent for Approval  Action details Meeting details
4/26/20071 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
4/25/20071 Utilities Reviewer Sent for Approval  Action details Meeting details
4/24/20071 Utilities Drafter Sent for Approval  Action details Meeting details
4/24/20071 Utilities Reviewer Reviewed and Approved  Action details Meeting details
4/23/20071 Utilities Drafter Sent for Approval  Action details Meeting details
4/20/20071 Utilities Reviewer Reviewed and Approved  Action details Meeting details
Explanation
1. BACKGROUND:
This legislation authorizes modifying the professional engineering services contract with URS Corporation in connection with the Big Walnut Augmentation/Rickenbacker Interceptor Sewer Project (BWARI Part 1); the Big Walnut Outfall Augmentation Sewer Project (BWARI Part 2); and the Big Walnut Outfall Augmentation Sewer Air Quailty Control Facility Project (AQCF).

This professional services contract was originally procured with a scope that included a multi-year renewable contract option for an entire scope of services. This provision allows the City to appropriate funds annually or on an as-needed basis depending upon the project's progress. This modification will fund services through March, 2008, and includes the engineering services during construction; materials testing; construction administration and inspection services for Part 1; Part 2 and the AQCF portions of the BWARI Project.

This project will construct in two parts. Part 1 will install a 168-inch diameter sanitary interceptor sewer from the Southerly Wastewater Treatment Plant to the Alum Creek Drive/State Route 317 intersection. Part 2 will construct a 144-inch diameter sanitary interceptor sewer from Alum Creek Drive/State Route 317 intersection north along Alum Creek Drive to the existing 108-inch Outfall Sewer and an Air Quality Control Facility (AQCF). The included Shook Road connection will allow the removal of the Spiegel Road pump station and a 42-inch trunk sewer that will be constructed to service the Rickenbacker Port Authority and will allow for the removal of the present pump station.

2. PROFESSIONAL ENGINEERING SERVICES MODIFICATION AWARD:
This contract is a multi-year contract that allows the City to appropriate funds on an as-need basis to cover the costs of services for a 12-18 month period, and is necessary to fulfill the schedule and funding commitments for this project. This work is a planned, continuation of the services as originally...

Click here for full text