File #: 0756-2010    Version: 1
Type: Ordinance Status: Passed
File created: 5/12/2010 In control: Public Service & Transportation Committee
On agenda: 6/7/2010 Final action: 6/9/2010
Title: To authorize the Director of Public Service to modify and increase the contract with DLZ Ohio Incorporated for the Hilliard Rome Road project for the Division of Design and Construction; to authorize the City Auditor to transfer cash and appropriation in the amount of $47,126.07 within and from the Street and Highway Improvement Fund to the Federal State Highway Engineering Fund; to appropriate $58,907.59 within the Federal State Highway Engineering Fund; to authorize the expenditure of $58,907.59 or so much thereof as may be needed from the Federal State Highway Engineering Fund; and to declare an emergency. ($58,907.59).
Attachments: 1. 0756-2010 Utilization Info.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
6/9/20101 CITY CLERK Attest  Action details Meeting details
6/8/20101 MAYOR Signed  Action details Meeting details
6/7/20101 Columbus City Council ApprovedPass Action details Meeting details
6/7/20101 COUNCIL PRESIDENT Signed  Action details Meeting details
5/18/20101 Service Drafter Sent to Clerk's Office for Council  Action details Meeting details
5/17/20101 EBOCO Reviewer Sent for Approval  Action details Meeting details
5/17/20101 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
5/17/20101 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
5/17/20101 Service Drafter Sent for Approval  Action details Meeting details
5/17/20101 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
5/14/20101 Auditor Reviewer Reviewed and Approved  Action details Meeting details
5/14/20101 CITY AUDITOR Reviewed and Approved  Action details Meeting details
5/14/20101 Service Drafter Sent for Approval  Action details Meeting details
5/13/20101 Service Drafter Sent for Approval  Action details Meeting details
5/13/20101 SERVICE DIRECTOR Reviewed and Approved  Action details Meeting details
5/13/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
5/13/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
5/13/20101 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
5/13/20101 SERVICE DIRECTOR Reviewed and Approved  Action details Meeting details
5/12/20101 Service Drafter Sent for Approval  Action details Meeting details
5/12/20101 Service Reviewer Reviewed and Approved  Action details Meeting details
Explanation
1. BACKGROUND
This legislation authorizes a modification to the design contract with DLZ Ohio, Incorporated, for the Hilliard Rome Road project. This project is being designed to reconstruct and widen Hilliard Rome Road from Westchester Woods Boulevard to south of Roberts Road. Total project length is 1.19 miles. The construction includes the addition of three (3) new traffic lanes, sidewalks, tree lawns, bike lanes and utility relocation. It is estimated to have a project completion date of June, 2012.

1.19 miles of 5 foot wide sidewalk will be added or reconstructed in this project on the east and west sides of Hilliard Rome Road, along with 10 foot wide bike lanes. 50 ADA ramps will be added or reconstructed in this project. There are 2 bus stops and transit routes within the limits of this project.
This project complies with the recommendation of the Pedestrian Thoroughfare Plan because the Division of Mobility Options reviewed walk widths for anticipated future activity.

Pedestrian generators and destinations impacting the proposed project include SilverHorn Shopping Center, Tanglewood Park Plaza, Huntington National Bank, Lake Spur Apartments, Wendy's and other businesses along the corridor.

Environmental "Green" materials or processes associated with this project include inclusion of street trees along Hilliard Rome Road.

This contract modification is necessary to include engineering services during construction and the cost to update traffic and lighting plans based on changed conditions and changed specifications.
It is necessary to modify the existing design contract with DLZ Ohio, Incorporated because they have project knowledge from developing the drawings to address future design issues that arise on site during construction.

The original contract amount was $438,862.00.

Due to the length of time that passed from initial start of design and changes in Ohio Department of Transportation standards, nume...