File #: 1969-2006    Version: 1
Type: Ordinance Status: Passed
File created: 10/27/2006 In control: Utilities Committee
On agenda: 11/20/2006 Final action: 11/22/2006
Title: To authorize the Director of Public Utilities to enter into a contract with Sauer Incorporated for the Hap Cremean Water Plant, Asbestos Hazard Abatement & Heating System Replacement, for the Division of Power and Water (pka the Division of Water), to authorize the expenditure of $3,711,750.00 from the Waterworks Enlargement Voted 1991 Bonds Fund, and to authorize the City Auditor to transfer funds within the Waterworks Enlargement Voted 1991 Bonds Fund, and to declare an emergency. ($3,711,750.00)
Attachments: 1. HCWP_VicMap.pdf, 2. Information to be included in Contracting Legislation 06-HCWP Asbestos - Boiler.pdf, 3. HCWPAsbestosBoilerBidTab.pdf, 4. HCWP Asbestos-Boiler Bid Evaluation Template-enlarged.pdf, 5. Final - HAP Cremean Advertisement - Sep 18 2006.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
11/22/20061 CITY CLERK Attest  Action details Meeting details
11/21/20061 MAYOR Signed  Action details Meeting details
11/20/20061 Columbus City Council ApprovedPass Action details Meeting details
11/20/20061 COUNCIL PRESIDENT Signed  Action details Meeting details
11/6/20061 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
11/6/20061 Utilities Drafter Sent for Approval  Action details Meeting details
11/6/20061 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
11/6/20061 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
11/3/20061 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
11/2/20061 Finance Reviewer Reviewed and Approved  Action details Meeting details
11/2/20061 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
11/2/20061 Utilities Drafter Sent for Approval  Action details Meeting details
11/2/20061 Auditor Reviewer Reviewed and Approved  Action details Meeting details
11/2/20061 CITY AUDITOR Reviewed and Approved  Action details Meeting details
11/2/20061 Utilities Drafter Sent for Approval  Action details Meeting details
11/1/20061 Utilities Drafter Sent for Approval  Action details Meeting details
11/1/20061 Finance Reviewer Reviewed and Approved  Action details Meeting details
10/31/20061 Utilities Reviewer Sent for Approval  Action details Meeting details
10/31/20061 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
10/27/20061 Utilities Drafter Sent for Approval  Action details Meeting details
10/27/20061 Utilities Drafter Sent for Approval  Action details Meeting details
10/27/20061 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: The Hap Cremean Water Plant (HCWP) was originally constructed in the 1950's with a significant addition constructed in the 1970's. A recently completed asbestos survey identified asbestos containing materials at the facility. This project will accomplish the removal of asbestos from miscellaneous buildings and the replacement of the heating system for the main treatment building at the plant. The insulation on the steam piping lines of the heating system are asbestos containing materials.

The procurement of this contract was conducted in accordance with Section 329.09.

Competitive bids were received and opened at the office of the Director of Public Utilities on October 25, 2006. Of the three (3) bids received, the lowest responsive and responsible and best bidder was Sauer Incorporated. The proposal submitted by the apparent low bidder, General Temperature Control is considered non-responsive due to failure to include a completed proposal bond, as required by Section 102.08 of the CMSC and as amended by SP-24 of the bid documents.

BIDDER AMOUNT

General Temperature Control $3,675,000.00
Sauer Incorporated $3,711,750.00
Bruner Corporation $3,763,200.00


EMERGENCY: Emergency legislation is being requested in order to execute the contract, review and approve the contractors proposed fabrication documents and begin equipment fabrication in time for the March 2007 boiler shut down. The Boiler system is the primary heat source for the HCWP and can only be taken out of service from March thru October. Emergency legislation is also requested in order to expedite the asbestos hazard abatement in the facility.

FISCAL IMPACT: This project is included in the 2006 CIB and $3,300,000.00 is budgeted. Funds are also being transfered within the CIB to fund the contract.


CONTRACT COMPLIANCE NUMBER: 25-0776180