File #: 3316-2022    Version: 1
Type: Ordinance Status: Passed
File created: 11/17/2022 In control: Public Utilities Committee
On agenda: 12/12/2022 Final action: 12/14/2022
Title: To authorize the Director of the Department of Public Utilities to enter into an agreement for General Engineering Services for the Fourth Water Plant CIP 690600-100000 with Hazen and Sawyer and to apply, accept, and enter into a Water Supply Revolving Loan Account loan agreement with the Ohio Water Development Authority and Ohio Environmental Protection Agency for the financing thereof and designate a dedicated source of repayment for the loan; to authorize the appropriation and transfer of $7,470,000.00 from the Water System Reserve Fund to the Water Supply Revolving Loan Account Fund; to authorize the appropriation and expenditure of $7,470,000.00 within the Water Supply Revolving Loan Account Fund; and to authorize an amendment to the 2022 Capital Improvements Budget; and to declare an emergency. ($7,470,000.00)
Attachments: 1. Ord 3316-2022 Funding, 2. Ord 3316-2022 Information, 3. Ord 3316-2022 Utilization
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a contract for engineering consulting services for the design of a forth water plant, and to apply for, accept, and enter into a Water Supply Revolving Loan Account Loan Agreement with the Ohio Water Development Authority and the Ohio Environmental Protection Agency for the financing thereof. The Fourth Water Plant (FWP) project will design and construct a new fourth water plant to meet water supply needs and increase the resiliency and reliability of the water supply system. The FWP will be located on City owned property in Delaware County, Concord Township, at the southeast corner of Dublin Road (S.R. 745) and Home Road (C.R. 124). (CIP # 690600-100000)

The City will initially enter into a contract for Study Services (Phase 1). The Phase 1 Study Services shall research and evaluate options related to the new water plant and develop a basis of design for the recommended improvements. It is the City’s intent to execute future contract modifications for Preliminary Design Services (Phase 2), Detailed Design Services (Phase 3), Engineering Services During Construction (Phase 4) and Engineering Services During Operation (Phase 5).

The Water Supply Revolving Loan Account (WSRLA) loan program requires legislation to authorize the Director of Public Utilities to execute the loan agreement for this project as identified in Section 2, under the direction of the Division of Water (DOW). This loan program is jointly administered by the Ohio EPA’s Division of Environmental and Financial Assistance (DEFA) and the Ohio Water Development Authority (OWDA). The WSRLA program provides below-market interest rate loans for municipal water system improvements.

The applicable Loan Administration Fees will be rolled into the loan upon execution of the Loan Agreement. The WSRLA loan will be paid off over a 20-year period from water service fees (the dedicated source of rep...