File #: 2917-2025    Version: 1
Type: Ordinance Status: First Reading
File created: 10/23/2025 In control: Public Utilities & Sustainability Committee
On agenda: 12/8/2025 Final action:
Title: To authorize the Director of the Department of Public Utilities to enter into a professional services contract with S&ME, Inc., for the Upground Reservoirs R1 and R3 Engineering Services project; to authorize an amendment to the 2025 Capital Improvement Budget; to make this ordinance contingent upon approval of a loan from the Ohio Water Development Authority; to appropriate funds within the Water - Fresh Water Market Rate Fund; and to authorize the expenditure of up to $4,442,883.00 from the Water - Fresh Water Market Rate Fund. ($4,442,883.00)
Indexes: MBE Participation, WBE Participation
Attachments: 1. ORD 2917-2025 UGR Vicinity Map, 2. ORD 2917-2025 Accounting Template, 3. ORD 2917-2025 Utilization Plan.pdf, 4. ORD 2917-2025 Sec of St SME
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.
Explanation
1. BACKGROUND
This ordinance authorizes the Director of Public Utilities to enter into a professional services contract through the City’s RFP process with S&ME, Inc. for the Upground Reservoirs R1 and R3 Engineering Services project, CIP No. 691504-100001, in an amount up to $4,442,883.00.

The Department of Public Utilities is engaged in a project to facilitate the construction of two upground reservoirs and appurtenant structures to support the Dublin Road Water Plant (DRWP) and the future Home Road Water Plant (HRWP), which utilize the Scioto River for surface water supply. Currently the existing John R. Doutt Upground Reservoir provides 9 billion gallons of off-stream storage to support the existing DRWP. Projected water usage growth in the City, the construction of a second water plant that will pull from the Scioto River, and recent droughts necessitate additional, reliable water supply sources, which these upground reservoirs will provide. Water quality provided by the City is essential to human health and economic growth and development.
The Upground Reservoirs R1 and R3 Engineering Services contract is for Professional Engineering Services (Design Professional or “DP” services) for the two needed reservoirs. The contract includes a preliminary design phase for both reservoirs (designated R1 and R3), raw water lines associated to each reservoir, the existing pump station and intake structure, and other appurtenant structures necessary for the overall function of the reservoir system. The work shall also include conceptual design of any required improvements or modifications including potential alternatives to existing support facilities and equipment to fulfill the project intent.

The primary objective of the DP services is to develop a concise set of design documents that will allow for the complete construction of facilities that will serve all intentions of their planned operation and will provide security, resiliency, flexibilit...

Click here for full text