BACKGROUND: This legislation authorizes the City Auditor to transfer the required funds that are necessary to allow the Department of Public Utilities, Division of Power and Water to reimburse the Division of Sewerage and Drainage for construction of a 24" water main in the State Route 317 London-Groveport Road area.
The Division of Sewerage and Drainage's contractor, McNally/Kiewit Joint Venture, was working on the Big Walnut Outfall Augmentation Sewer, Part 2 Project (Ordinance No. 1519-2004), and discovered a water line needing repair. Since the contractor was already on site, it was most feasible in regard to time, cost, and convenience, to go forth with repairs for the Division of Power and Water. The cost of the water line reimbursement is $171,040.00.
FISCAL IMPACT: This legislation includes a transfer of funds within the Water Works Enlargement Voted Bonds Fund and an amendment to the 2008 Capital Improvements Budget.
Title
To authorize the City Auditor to transfer the required funds that are necessary to allow the Department of Public Utilities, Division of Power and Water to reimburse the Division of Sewerage and Drainage for construction of a 24" water main in the State Route 317 London-Groveport Road area; to authorize the transfer and expenditure of $171,040.00 within the Water Works Enlargement Voted Bonds Fund; and to authorize an amendment to the 2008 Capital Improvements Budget; for the Division of Power and Water. ($171,040.00)
Body
WHEREAS, the Division of Sewerage and Drainage's contractor, McNally/Kiewit Joint Venture, was working on the Big Walnut Outfall Augmentation Sewer, Part 2 Project and discovered a water line needing repair; and
WHEREAS, the Divisions of Sewerage and Drainage and Power and Water agreed to have the contractor go forth with repairs since they were already on site and would reap savings in time, cost, and convenience; and
WHEREAS, the Division of Power and Water needs...