File #: 1848-2005    Version: 1
Type: Ordinance Status: Passed
File created: 10/26/2005 In control: Utilities Committee
On agenda: 12/12/2005 Final action: 12/14/2005
Title: To authorize the Director of Public Utilities to modify the contract with DLZ Ohio, Inc., for Professional Engineering Services for the South Wellfield Expansion - Raw Water Line, for the Division of Water, and to authorize the expenditure of $295,499.94 from Waterworks Enlargement Voted 1991 Bonds Fund. ($295,499.94)
Attachments: 1. PAWP_VicMap.pdf, 2. Information to be included in Contracting Legislation 05-080.pdf, 3. SWF RWL scope of services.pdf, 4. Proposed Eng Design Sched-10-31-052.pdf, 5. MODIFICATION 1 TOTAL SWF RWL 11-02-05.pdf, 6. Mod 1 scope SWF RWL 11-2-05.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
12/14/20051 MAYOR Signed  Action details Meeting details
12/14/20051 ACTING CITY CLERK Attest  Action details Meeting details
12/12/20051 Columbus City Council ApprovedPass Action details Meeting details
12/12/20051 COUNCIL PRESIDENT Signed  Action details Meeting details
12/5/20051 Columbus City Council Read for the First Time  Action details Meeting details
11/23/20051 Auditor Reviewer Reviewed and Approved  Action details Meeting details
11/23/20051 CITY AUDITOR Reviewed and Approved  Action details Meeting details
11/23/20051 Utilities Drafter Sent for Approval  Action details Meeting details
11/23/20051 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
11/23/20051 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
11/22/20051 CITY AUDITOR Reviewed and Disapproved  Action details Meeting details
11/22/20051 Utilities Drafter Sent for Approval  Action details Meeting details
11/18/20051 Utilities Drafter Sent for Approval  Action details Meeting details
11/16/20051 Finance Reviewer Reviewed and Approved  Action details Meeting details
11/16/20051 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
11/15/20051 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
11/15/20051 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
11/15/20051 Utilities Drafter Sent for Approval  Action details Meeting details
11/14/20051 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
11/14/20051 Utilities Drafter Sent for Approval  Action details Meeting details
11/11/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
11/11/20051 Utilities Drafter Sent for Approval  Action details Meeting details
11/11/20051 Utilities Reviewer Sent for Approval  Action details Meeting details
11/3/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
11/3/20051 Utilities Drafter Sent for Approval  Action details Meeting details
11/3/20051 Utilities Drafter Sent for Approval  Action details Meeting details
10/26/20051 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: As per the recommendations of the Water Beyond 2000 project, the Division of Water is undertaking the expansion of its well fields serving the Parsons Avenue Water Plant (PAWP). This contract modification will provide for engineering design for installation of raw water transmission lines to the PAWP from each of four different City owned wellsites.

CC 329.16 CONTRACT MODIFICATIONS:
1. Amount of additional funds to be expended under this modification: $295,499.94
2. The services identified to be included in this contract modification were not anticipated at the time of executing the original contract. The original contract provided for engineering design for the work anticipating a substantial portion of the raw-waterline alignment would fall within the right-of-way of US 23. Ohio Department of Transportation disallowing longitudinal occupancy of the right-of-way in US 23 for placement of the Raw Water Line has necessitated a substantial portion of this contract modification. The majority of the costs included in this modification are for engineering and surveying services to prepare legal description and plats to be utilized by the City Attorney - Real Estate Division in Land Acquisition activities. Easement preparation was indicated as an "If Authorized" task in the original proposal, with no costs assigned to the task. Additional costs are included for design of a Telemetry System (low frequency radios) in lieu of the fiber optic system that was originally included in the design scope. The evolution of lower frequency radios over the last several years has made this option more reliable than what was available at the time the contract was executed. The telemetry system will result in lower construction costs than the fiber optic option.
3. The work under this contract modification is a continuation of work previously performed by the Consultant; therefore, no other processes were used for procurement of these service...