header-left
File #: 1743-2019    Version: 1
Type: Ordinance Status: Passed
File created: 6/18/2019 In control: Public Utilities Committee
On agenda: 7/22/2019 Final action: 7/25/2019
Title: To authorize the Director of Public Utilities to modify an existing engineering agreement with Brown and Caldwell for the SWWTP Digestion Process Expansion project; to authorize an expenditure of up to $397,198.00 from the Sanitary Sewers General Obligation (G.O.) Bond Fund. ($397,198.00)
Attachments: 1. Ord 1743-2019 Director's Legislation Information Sheet (1-23-2019), 2. Ord 1743-2019 Schedule 2A-1 - Subcontractor Utilization Form, 3. Ord 1743-2019 Dax Financial Form SWWTP Digester Expansion
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to modify (Mod #1) an existing engineering agreement with Brown and Caldwell for Professional Engineering Services (Design Professional, or “DP” services) for the SWWTP Digestion Process Expansion project, CIP 650353-100003. This contract will provide Preliminary Design Services (Step 1), Detailed Design and Bidding Services (Step 2), and Services During Construction (Step 3) for this project. The initial phase of this contract provided Professional Engineering Services for Preliminary Design (Step 1) and Professional Engineering Services for Detailed Design and Bidding Services (Step 2).

This modification is for a redesign of the original SWWTP Digester Process Expansion and will keep the design for the Digester 6 cover, Digester 7, electrical building, digester boiler system rehabilitation, and rehabilitation of Digester 1-5. The design will be modified to keep the Acid Phase Digesters (APD), modify the surface withdraw piping, replace all steam injectors, and provide a new foam separator and sediment trap for Digester 07.

A future renewal will be requested for Step 3, Engineering Services During Construction, which will include technical project representation (TPR) duties, construction-phase engineering, start-up and commissioning assistance, and record documentation. Construction Management Services will be performed by others.

Planning Area: 99 - City wide
1.1 Amount of additional funds to be expended: $397,198.00
Original Contract $ 2,461,829.00
Modification 1 (current) $ 397,198.00
Total $ 2,859,027.00

1.2 Reasons additional goods/services could not be foreseen:
This is a unplanned modification.
1.3 Reasons other procurement processes are not used:
This work cannot be bid out because the DP had a completed and biddable design at the time that this project was placed on hold. Most of the major modifications to the design are ...