Explanation
1. BACKGROUND:
This legislation authorizes the Director of Public Utilities to modify an existing professional engineering services contract for the Clintonville Main Rehabilitation Project with Malcolm Pirnie, Inc. for purposes of completing the required engineering services, to authorize the transfer within and expenditure of $23,897.00 from the Sanitary B.A.B.s (Build America Bonds) Fund for the Division of Sewerage and Drainage, and to amend the 2009 Capital Improvement Budget.
This modification (Mod #1) will increase the funding of the contract by an additional $23,897.00. The work to completed in this modification includes the following: removal of the Designed Sewer Relief, additional design work and permits for the stormwater work, and closing abandoned lateral lines; this contract will also review the manhole rehabilitation documentation, assemble the pre and post CCTV logs for the record file to correspond with the record drawing numbers, and complete and submit the record drawings based on the recorded construction documentation. Also, digital copies of the design information and reports will be provided.
The original contract for Malcolm Pirnie, Inc. was for the preparation of construction plans and specifications for the Clintonville Main Rehabilitation Project based on a preliminary study performed to investigate the infiltration and inflow problems in the Clintonville Area and part of the terms of the Consent Order between the City and the Ohio Attorney General's Office.
1.1. Amount of additional funds to be expended: $23,897.00
Original Contract Amount: $305,312.00
Modification 1 (Current) $ 23,897.00
Total (Orig. + Mod 1) $ 329,209.00
1.2. Reasons additional goods/services could not be foreseen:
During the investigation additional design tasks were identified that would add to the environmental benefits of the project. The elimination ...