Explanation
This modification is for engineering services that include the upgrade of certain aspects of the present HVAC system in order to obtain better control between the upstairs balcony area versus the lower lobby and restrooms at the Adventure Center. Thermostatic control for the north end of the facility (both upper exercise area and lower areas) are via thermostats located on the upper area which causes discrepancies and complaints. Also, the modification will add better air flow control and energy conservation for the two south air handlers with variable speed drives.
Kramer Engineers, Inc. was originally selected for this project from proposals received from seven (7) engineering firms (0049-2009). It was determined that the proposal from Kramer Engineers, Inc. far exceeded the other firms, and therefore was selected based on experience, availability, and knowledge of project site.
Principal Parties:
Kramer Engineers
Ralph Kramer (Contact)
394 Oak Street
Columbus, OH 43115
614-233-6911 (Phone)
31-1035777 (Contract Compliant through 10/19/2012)
5-24 (Columbus Employees)
Fiscal Impact:
$3,800.00 from the Recreation and Parks Voted Bond Fund
Title
To authorize the Director of Recreation and Parks to modify the contract with Kramer Engineers, Inc. for professional services related to the HVAC Improvements at Various Locations 2009 project in which this modification will improve controls between the upstairs balcony area versus the lower lobby and restrooms at the Franklin Park Adventure Center; to authorize the expenditure of $3,800.00 from the Voted Recreation and Parks Bond Fund. ($3,800.00)
Body
WHEREAS, it is necessary to modify the contract with Kramer Engineers, Inc. for professional services in conjunction with the HVAC Improvements at Various Locations 2009 Project; and
WHEREAS, the modification will improve controls between the upstairs balcony area versus the lower lobby and restrooms at the...
Click here for full text