Explanation
1. BACKGROUND:
A. Need. This legislation authorizes the Director of Public Utilities to enter into a construction contract with TP Mechanical Contractors, Inc., for the Fairwood Facilities Improvements project for the Division of Sewerage and Drainage. The Fairwood Facility is responsible for the operation, maintenance and repair of the City's sewer collection system and houses various City staff including the Division of Police and Fire operations on the premises which function 24/7.
The proposed contract with TP Mechanical Contractors, Inc. is for Contract F31, HVAC Improvements. This contract Work consists of the removal and replacement of one rooftop Air Handler Unit on the existing building and one boiler on the building's mezzanine.
The contract was advertised in the City Bulletin, and bids were received on May 6, 2009, as follows:
1. Kirk Williams Mechanical Service Co. | Maj | 31-4401733 | $72,481.00
2. TP Mechanical Contractors, Inc. | Maj | 20-0251494 | $76,118.00
3. Air Time Heating & Cooling, Inc. | Maj | 31-1604866 | $77,800.00
4. General Temperature Control | Maj | 31-1201236 | $78,430.00
5. The C.D. Whitfield Co., LLC | Maj | 26-0564317 | $79,708.00
6. Farber Corporation | Maj | 31-0746886 | $80,740.00
The Architect's construction cost estimate was $118,468.00
The apparent low bidder was determined to be non-responsive because of an incomplete Bid Bond. The award is recommended to the second low bidder, whose bid was responsive.
Award is recommended to the lowest Responsive and Responsible and Best Bidder.
B. Contract Compliance No.: TP Mechanical Contractors 200251494 (MAJ) (Expires 04/29/2010)
C. Emergency Designation: No emergency designation is requested for this legislation
2. FISCAL IMPACT:
This ordinance authorizes the Director of Public Utilities to transfer and expend $76,118.00 in funds from the...