File #: 2205-2012    Version: 1
Type: Ordinance Status: Passed
File created: 10/3/2012 In control: Public Service & Transportation Committee
On agenda: 10/29/2012 Final action: 10/31/2012
Title: To authorize the Director of Public Service to modify and increase an existing contract with with URS Corporation - Ohio, for professional services for the Arterial Street Rehabilitation - Hard Road Phase A/Sawmill Road - Smoky Row Road project, for the Division of Design and Construction; to authorize the transfer of funds within and from the Streets and Highways G.O. Bonds Fund to the Fed-State Highway Engineering Fund; to appropriate and authorize the expenditure of $105,000.00 within the Fed-State Highway Engineering Fund; and to declare an emergency. ($105,000.00)
Explanation
1. BACKGROUND:
This ordinance authorizes the Director of Public Service to modify and increase a professional engineering services contract with URS Corporation - Ohio for the Arterial Street Rehabilitation - Hard Road Phase A/Sawmill Road - Smoky Row Road project. This is the first modification to the original contract.

This project is being designed to widen Hard Road between Sawmill Road and Smoky Row Road. The project will include widening and reconstruction from two lanes to five lanes, sidewalks, storm sewers, street lights, curbs, and bike lanes on the north and south sides of the street.

The contract modification is necessary to provide additional design services to update plans to incorporate additional comments received on roadway construction plan documents; perform a profile evaluation to balance lowering over water main, provide engineering design services during pre-construction and provide post-construction record plan drawings with an electronic and hard copy submission.
This modification is an addition to the original scope of services but is a continuation of the existing work being performed and it would not be practical or cost effective to the City to contract with a different consultant.

The original contract amount authorized by ordinance 1108-2010, final action July 28, 2010, was $1,201,162.00. (EL010946)
The total of this modification, no. 1, is $105,000.00.
The contract amount, including this modification, is $1,306,162.00.

That Searches in the Excluded Party List System (Federal) and the Findings for Recovery list (State) produced no findings against URS Corporation - Ohio.

2. CONTRACT COMPLIANCE
The contract compliance number for URS Corporation - Ohio is 340939859 and expires 7/28/13.

3. FISCAL IMPACT
Funding for this project is available within the Streets and Highways G.O. Bonds Fund. These funds will be transferred to the Hard Road Phase A grant in the Fed-State Highway Engineering Fund, number...