Title: To authorize the Director of the Department of Public Utilities to modify and increase the contract with Advanced Engineering Consultants, Ltd. for the Southerly Waste Water Treatment Plant East Aeration Control Building HVAC & Air Purification project; to authorize an amendment to the 2023 Capital Improvement Budget; to authorize a transfer of funds from the Sanitary Reserve Fund to the Sanitary Fresh Water Market Rate Fund; to authorize the appropriation of funds; to authorize the expenditure of $542,574.00 from the Sanitary Fresh Water Market Rate Fund; and to declare an emergency. ($542,574.00)
Indexes: MBE Participation
Attachments: 1. ORD 1610-2024 Accounting Template, 2. ORD 1610-2024 Utilization
Explanation

1. BACKGROUND
This ordinance authorizes the Director of Public Utilities to enter into a planned contract modification for professional engineering services during construction with Advanced Engineering Consultants, Ltd. for the Southerly Waste Water Treatment Plant (SWWTP) East Aeration Control Building (EAC) HVAC & Air Purification project, CIP #650372-100000, in an amount up to $542,574.00.

The HVAC & Air Purification Units in the Southerly Waste Water Treatment Plant East Aeration Building are nearing the end of their operational life, leading to inefficiencies and maintenance challenges. The original contract provided preliminary design to address the challenges of the aging systems. Renewal No. 1 for Step 2 services, expanded the project's scope to include Detailed Design to include generating detailed plans and specifications, bid documents, construction contract documents, and other design phase services, alongside a crucial expansion to include a full roof replacement due to the deteriorated state of the existing roof. This modification, Modification 1 for Step 3 Services, will involve Engineering Services during Construction, providing critical oversight for the installation of new systems and the roof, ensuring precision and adherence to stringent construction standards and schedules.

This project is coded as “99 - Citywide”.

1.1 Amount of additional funds to be expended: $542,574.00
Original Contract Amount: $121,506.83 (ORD 0933-2020 PO230129)
Renewal #1 Amount: $310,065.00 (ORD 1615-2021 PO285961)
Modification #1 (current): $542,574.00 (Current)
Total (Orig. + Renewal/Modification): $974,845.83

1.2. Reason other procurement processes are not used:
This contract was bid using the City’s Request for Proposal process. This is a plan...