File #: 2668-2018    Version: 1
Type: Ordinance Status: Passed
File created: 9/20/2018 In control: Public Utilities Committee
On agenda: 11/5/2018 Final action: 11/7/2018
Title: To authorize the Director of Public Utilities to enter into an agreement with MS Consultants Engineering Group, Inc. for professional engineering services for the Clintonville 2 East Storm Sewer Assessment Project for the Division of Sewerage & Drainage, Stormwater Section; to authorize a transfer and an expenditure in an amount up to $610,120.24 within the Storm Sewer Bonds Fund; and to amend the 2018 Capital Improvements Budget. ($610,120.24)
Attachments: 1. Ord. 2668-2018 Auditor-s Certificate, 2. Ord. 2668-2018 Clintonville 2 East - Map, 3. Ord. 2668-2018 Clintonville 2 East - Utilization
Explanation

1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a professional engineering services agreement with MS Consultants Inc. for the Clintonville 2 East Storm Sewer Assessment Project, in an amount up to $610,120.24, for Division of Sewerage & Drainage, Stormwater Section CIP No. 611625-110192.

The scope of work is to perform condition assessments and cleaning of the existing stormwater sewer systems in the Clintonville 2 East Blueprint Project area. The City wants to clean and assess the existing storm sewers within the area to determine their structural integrity prior to the construction of green infrastructure.

This project will consist of a systematic approach to assess and clean the storm sewer systems within the Clintonville 2 (East of High Street) Blueprint Columbus project areas. The consultant will investigate all relevant data sources, field conditions, and records; perform all required assessments, inspections, and video recordings; and will submit the relevant data to the City. The approximate length of the sewers to be inspected is roughly 57,412 linear feet.

The Community Planning Area: 10 (Clintonville).

2. FUTURE MODIFICATION(S): There are no anticipated future modifications for this project.

3. TIMELINE: Cleaning and assessment work is anticipated to begin in September 2018, with completion of the work/contract occurring in April 2020.
4. ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT:
Blueprint Columbus is the integrated plan to stop and mitigate the impact of sanitary sewer overflows (SSOs) and water in basement events (WIBs) by removing inflow and infiltration (I/I) from the system, as well as to provide adequate capacity to convey and treat base and peak flows for all parts of the collection system.
5. BID INFORMATION: The selection of the firm providing the professional engineering services has been performed in ac...