Explanation
1. BACKGROUND:
This legislation authorizes the Director of Public Service to enter into a contract for the construction of the Resurfacing - Resurfacing 2011 (Zone 2) project.
This project consists of rehabilitating and resurfacing thirty (30) city streets and constructing 394 ADA curb ramps along those streets. The work consists of milling the existing pavement, overlaying with new asphalt concrete, minor curb replacement, and replacing curb and sidewalk associated with installation of ADA wheelchair ramps. Where warranted, the plans also call for areas of full depth pavement rehabilitation, and such other work as may be necessary to complete the contract in accordance with the plans and specifications set forth in the bid submittal documents.
The Franklin County Engineer has also requested paving work to be performed on Olentangy River Road as part of this project and has contributed funding for this part of the project.
The estimated Notice to Proceed date is April 25, 2011. The contract length is 135 days from the Notice to Proceed date. The project was let by the Office of Support Services through vendor services. 4 bids were received on February 25, 2011 (4 majority) and tabulated on February 28 as follows:
Company Name Bid Amt City/State Majority/MBE/FBE
Strawser Paving $5,092,852.98 Columbus, OH Majority
Kokosing Construction Company $5,122,459.84 Columbus, OH Majority
Shelly and Sands, Inc. $5,219,449.10 Columbus, OH Majority
The Shelly Company $5,387,276.41 Columbus, OH Majority
Award is to be made to Strawser Paving Company, as the lowest, best, most responsive and most responsible bidder.
Searches in the Excluded Party List System (Federal) and the Findings for Recovery list (State) produced no ...