Explanation
BACKGROUND: The original contract for the Hap Cremean Water Plant High & Low Service Piping Coating provided for the condition assessment, engineering design, construction administration, and resident field services for the piping coating. This modification provides for additional construction administration and resident field services due to the increase the project scope, construction duration, and protracted close-out of the original contract.
EMERGENCY PROVISION: Emergency legislation is being requested to provide these services concurrently with the ongoing construction contract and to finish work prior to start of summer high water pumpage.
CC 329.16 CONTRACT MODIFICATIONS:
1. Amount of additional funds to be expended under this modification: $75,000.00.
2. The extent of additional services provided are needed due to the additional construction administration and resident field services due to the increase in the project scope, construction duration, and close-out of the of the original contract.
3. The work under this contract modification is a continuation of work previously performed by the Consultant, therefore, no other processes were used for procurement of these services.
4. The cost of this modification is based on material and labor, and was negotiated between the Consultant and the City, as documented by the Consultant's quotation letter, and verified by the Project Engineer.
CONTRACT AMOUNT:
Original contract amount $ 80,960.00
Modification No.1 $ 75,000.00
New contract amount $ 155,960.00
FISCAL IMPACT: The last authorization for expenditures for Engineering services on this project occurred July 25, 2002 for the original contract in the amount of $80,960.00. This project is include...