File #: 0292-2005    Version: 1
Type: Ordinance Status: Passed
File created: 2/4/2005 In control: Utilities Committee
On agenda: 3/7/2005 Final action: 3/9/2005
Title: To authorize the Director of Public Utilities to modify the contract with Stone Environmental Engineering & Science, Inc. for the Federally Mandated Spill Prevention, Control and Countermeasures plan for the Division of Electricity; to authorize the expenditure of $13,000.00 from the Voted Street Lighting and Electricity Distribution Improvements Fund; and to declare an emergency. ($13,000.00)
Date Ver.Action ByActionResultAction DetailsMeeting Details
3/9/20051 CITY CLERK Attest  Action details Meeting details
3/8/20051 MAYOR Signed  Action details Meeting details
3/7/20051 Columbus City Council ApprovedPass Action details Meeting details
3/7/20051 COUNCIL PRESIDENT Signed  Action details Meeting details
2/23/20051 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
2/22/20051 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
2/17/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/17/20051 Auditor Reviewer Reviewed and Approved  Action details Meeting details
2/17/20051 CITY AUDITOR Reviewed and Approved  Action details Meeting details
2/17/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/16/20051 Finance Reviewer Reviewed and Approved  Action details Meeting details
2/16/20051 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
2/15/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/14/20051 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
2/14/20051 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
2/11/20051 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
2/11/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/10/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
2/9/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
2/9/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/4/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/4/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
2/4/20051 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation


BACKGROUND: This legislation authorizes the Director of Public Utilities to modify the existing contract with Stone Environmental Engineering & Science, Inc., EL004192, for the Spill Prevention, Control and Countermeasures (SPCC) plan. This modification is necessary to design a building to house SF6 breakers as part of the plan to meet United States Environmental Protection Agency requirements.

1. Amount of additional funds to be expended under modification: $13,000
The original amount of the contract was $70,512 and was previously increased by $18,500 for design of a control building foundation. This modification will bring the new total amount to $102,012.

2. Reason additional goods/services could not be foreseen initially: The original contract to develop a Spill Prevention Control and Countermeasures plan was awarded based upon Requests for Statement of Qualifications, opened November 19, 2003. After the contract was awarded, it was determined that an effective way to meet EPA requirements would be to replace old oil circuit breakers with non-polluting SF6 breakers and to house the equipment in a pre-engineered control building. This decision resulted in a modification to include the design of the control building foundation, as authorized by Ordinance 1502-2004. The formal bids received through the Purchasing Office for the pre-engineered building were considerably higher than the estimated cost. Therefore, the Division of Electricity is recommending a modification to provide engineering services to design a concrete block building with lighting, electrical receptacles, heating, ventilation and air conditioning.

3. Reason other procurement process are not used: Stone Environmental Engineering & Science, Inc. was selected to develop the SPCC plan based upon their expertise and qualifications in this field, as well as the low cost of their proposal. Due to the fact that they have been instrumental in developing the pl...