Title: To authorize the Director of Public Utilities to execute a contract modification to the professional engineering services agreement with Malcolm Pirnie, Inc. for the Southerly Wastewater Treatment Plant New Headworks project; and to authorize the expenditure of $583,000.00 within the B.A.B.s (Build America Bonds) Fund for the Division of Sewerage and Drainage. ($583,000.00).
Attachments: 1. Sub-Contractor WIF 650352-100000 Mod #10.pdf, 2. MPI Mod #10 LEGISLATION B 0929102.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
12/16/20101 CITY CLERK Attest  Action details Meeting details
12/14/20101 MAYOR Signed  Action details Meeting details
12/13/20101 Columbus City Council ApprovedPass Action details Meeting details
12/13/20101 COUNCIL PRESIDENT Signed  Action details Meeting details
12/6/20101 Columbus City Council Read for the First Time  Action details Meeting details
11/15/20101 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
11/15/20101 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
11/12/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
11/12/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
11/12/20101 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
11/12/20101 Utilities Drafter Sent for Approval  Action details Meeting details
11/11/20101 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
11/10/20101 Auditor Reviewer Reviewed and Approved  Action details Meeting details
11/10/20101 CITY AUDITOR Reviewed and Approved  Action details Meeting details
11/10/20101 Utilities Drafter Sent for Approval  Action details Meeting details
11/9/20101 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
11/9/20101 Utilities Drafter Sent for Approval  Action details Meeting details
11/8/20101 EBOCO Reviewer Sent for Approval  Action details Meeting details
11/5/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
11/5/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
11/5/20101 Utilities Drafter Sent for Approval  Action details Meeting details
11/4/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
10/29/20101 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
10/29/20101 Utilities Drafter Sent for Approval  Action details Meeting details
10/28/20101 Utilities Reviewer Sent for Approval  Action details Meeting details
10/27/20101 Utilities Drafter Sent for Approval  Action details Meeting details
10/27/20101 Utilities Drafter Sent for Approval  Action details Meeting details
10/26/20101 Utilities Reviewer Reviewed and Approved  Action details Meeting details
10/21/20101 Utilities Reviewer Reviewed and Approved  Action details Meeting details
10/21/20101 Utilities Drafter Sent for Approval  Action details Meeting details
10/19/20101 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

1. BACKGROUND:

A. Need. This legislation authorizes the Director of Public Utilities to modify the professional engineering services agreement with Malcolm Pirnie, Inc. for the Southerly Wastewater Treatment Plant (SWWTP) New Headworks project. The Malcolm Pirnie, Inc. modification amount requested under this ordinance is $583,000.00. The contract total including this modification is $18,076,045.77. The proposed contract modification provides funding for preparation of a Federal ARRA (Stimulus) grant funding request/application for the Waste Digester Gas Utilization Improvements construction contract, Detailed Design services, and Services During Construction estimated to be needed for these improvements. This contract modification is a continuation of the services included within the existing contract's scope of service. The design of the headworks decommissioning included installing the digester gas line from the anaerobic digesters to the Screen and Grit Building boilers. The additional work included in this modification is a logical extension of this digester gas service line to the Service Building, which it passes. The existing fuel oil boilers in the Service Building have exceeded their useable life by more than 20 years and are no longer operating at optimum performance. The use of digester gas by the boilers in the both buildings will reduce the plant's daily need for natural gas and fuel oil. The transition to burning digester gas greatly reduces the amount of fossil fuel greenhouse gases released during boiler operation. The potential need for portions of this work was foreseen and so stated in the original contract's legislation, and is therefore a planned continuation of the services originally included within the existing contract's scope of service. It is not deemed either feasible or reasonable to suspend work with the entity currently under contract and undertake continuation of these services with another procurement. The ...

Click here for full text