Explanation
BACKGROUND:
The Columbus Thoroughfare Plan was adopted by City Council on December 6, 1993 by Ordinance 2518-93 and has not been amended since. This ordinance updates the Thoroughfare Plan to reflect the roadway network of the Interim Hayden Run Corridor Plan, thus providing Thoroughfare Plan guidance for this growth area of Columbus.
FISCAL IMPACT:
No funding is required for this ordinance.
Title
To amend the Columbus Thoroughfare Plan to reflect the roadway network of the Interim Hayden Run Corridor Plan. (AMENDED BY ORD. 1950-2019; PASSED 7/29/2019)
Body
WHEREAS, the Columbus Thoroughfare Plan was adopted by City Council on December 6, 1993 by Ordinance 2518-93 and has not been amended since; and
WHEREAS, it is necessary periodically to revise and update plans and ordinances related to the health, safety, and welfare of the general public which pertain to the street system within the City's corporate limits; and
WHEREAS, the process to develop the Interim Hayden Run Corridor Plan included preparation of a roadway network for the planning area; and
WHEREAS, amending the Thoroughfare Plan to include this roadway network will provide Thoroughfare Plan guidance for this growth area of Columbus; now, therefore,
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF COLUMBUS:
Section 1. That the Columbus Thoroughfare Plan (adopted by Ordinance 2518-93) is hereby amended to classify or reclassify the following roadway corridors contained in the Interim Hayden Run Corridor Plan:
ROADWAY FROM TO CLASS
Tuttle Crossing Blvd. Avery Rd. I-270 6-2D
Tuttle Crossing Blvd. Amity Pike at Madison/Franklin Co. line Avery Rd. 4-2D
Cosgray-Britton Connector East of Cosgray Rd. Britton Rd. 4-2D
Wilcox Rd. Leap Rd. Britton Rd. 4-2D
Houchard Rd Hayden Run Rd. Rings Rd. 4-2D
Cosgray Rd. Alton-Darby Rd. Scioto-Darby Creek Rd. 4-2D
Britton Rd. Hayden Run Rd. South of Tuttle Crossing Blvd. 4-2D
Britton Rd. Cemetery Rd. Davidson Rd. 4-2D
Service Rd....