header-left
File #: 2335-2019    Version: 1
Type: Ordinance Status: Passed
File created: 9/4/2019 In control: Recreation & Parks Committee
On agenda: 9/23/2019 Final action: 9/25/2019
Title: To authorize and direct the Director of Recreation and Parks to sign a Maintenance Agreement with the Ohio Department of Transportation for the improvements made as part of the Olentangy Trail --Antrim Park to Bethel Road Connector project; and to declare an emergency
Attachments: 1. pid99743-FINAL-REVISED
Explanation

This legislation authorizes the Director of the Recreation and Parks to sign a Maintenance Agreement with the Ohio Department of Transportation for the improvements made as part of the Olentangy Trail --Antrim Park to Bethel Road Connector project. ODOT PID # 99743

Background: Recreation and Parks is constructing improvements to the Olentangy Trail between Antrim Park and Bethel Road. The project includes trail improvements within the Bethel Road section across SR 315. The maintenance agreement specifies that CRPD will be responsible for maintaining and inspecting the culvert, lighting, and safety items within the limited access right-of-way controlled by ODOT.

Principal Parties:
Ohio Department of Transportation
Mitch Blackford, Deputy Director
District 6
400 East William Street
Delaware, OH 43015

Emergency Justification: An emergency is being requested to enter into said contract as the construction of the project is underway, and ODOT wishes to have the agreement in place.

Benefits to the Public: Safe access for thousands of residents along the Bethel Road/Olentangy River Road corridor by: widening the trail from 9’ to 12’ to increase capacity; installing guardrail separation along sections where 315 and trail are too close for trail users and motorist safety; constructing a fully compliant connector ramp from the trail to Bethel Road; constructing a shared use path along Bethel Road to Olentangy River Road/Anheuser Busch Park, creating a new, easy access trail head.

Area(s) Affected: Olentangy Trail --Antrim Park to Bethel Road Connector

Master Plan Relation: This project will support the mission of the Recreation and Parks Master Plan by improving access to trails and greenways corridors. Improving the environmental health of the city’s waterways; improving recreational access to streams; providing long term protection corridors for water quality and trail development.

Fiscal Impact: No fiscal action is requested at ...

Click here for full text