Explanation
BACKGROUND: The Hap Cremean Water Plant (HCWP) was originally constructed in the early 1950's; the plant was doubled in size in the early 1970's with periodic additional construction since initiation. Most buildings are constructed with brick and stone exteriors. The Division of Water is undertaking a brick and stonework restoration of the building exteriors. This contract provides professional engineering services for a site assessment survey to identify rehabilitation work, preparation of drawings and specifications for masonry and stone rehabilitation work for all the brick/stone structures located at HCWP, and construction administration and inspection services for identified work.
A total of seven (7) proposals were received September 26, 2003 in response to the advertised Request for Proposals (RFP). One of the responses was from a MBR firm; one of the responses was from a FBE firm. A three (3) member evaluation committee evaluated the proposals and ranked the offerors based upon the evaluation criteria specified in the RFP: qualifications of staff, specialized experience, project approach, professional qualifications, past performance, meeting schedules and budgets, and location of staff. Burgess & Niple, Inc. was ranked as the most responsive.
FISCAL IMPACT: This project is included in the 2004 CIB and $650,000.00 is budgeted.
CONTRACT COMPLIANCE NUMBER: 31-0885550
Title
To authorize the Director of Public Utilities to enter into a contract with Burgess & Niple, Inc. for the Hap Cremean Water Plant Exterior Masonry Rehabilitation, for the Division of Water, to authorize the expenditure of $384,800.00 from the Waterworks Enlargement Voted 1991 Bonds Fund. ($384,800.00)
Body
WHEREAS, The Hap Cremean Water Plant (HCWP) was originally constructed in the early 1950's; the plant was doubled in size in the early 1970's with periodic additional construction since initiation. Most buildings are constructed w...