header-left
File #: 0198-2005    Version: 1
Type: Ordinance Status: Passed
File created: 1/25/2005 In control: Utilities Committee
On agenda: 2/28/2005 Final action: 3/2/2005
Title: To authorize the Director of Public Utilities to modify the contract for professional engineering design and technical project services with Fuller, Mossbarger, Scott, and May Engineers, Inc. for the Skyline Drive Stormwater System Improvements Project for the Division of Sewerage and Drainage; to authorize the expenditure of $30,020.92 within the Storm Sewer Bond Fund; and to declare an emergency. ($30,020.92)
Attachments: 1. Skyline Drive (#27).tif
Date Ver.Action ByActionResultAction DetailsMeeting Details
3/2/20051 MAYOR Signed  Action details Meeting details
3/2/20051 CITY CLERK Attest  Action details Meeting details
2/28/20051 Columbus City Council ApprovedPass Action details Meeting details
2/28/20051 COUNCIL PRESIDENT Signed  Action details Meeting details
2/17/20051 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
2/15/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/15/20051 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
2/10/20051 Auditor Reviewer Reviewed and Approved  Action details Meeting details
2/10/20051 CITY AUDITOR Reviewed and Approved  Action details Meeting details
2/9/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/8/20051 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
2/7/20051 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
2/3/20051 Utilities Drafter Sent for Approval  Action details Meeting details
2/2/20051 Finance Reviewer Reviewed and Approved  Action details Meeting details
2/2/20051 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
1/31/20051 Utilities Reviewer Sent for Approval  Action details Meeting details
1/31/20051 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
1/31/20051 Utilities Drafter Sent for Approval  Action details Meeting details
1/26/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
1/25/20051 Utilities Drafter Sent for Approval  Action details Meeting details
1/25/20051 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND. This legislation authorizes modifying the contract for professional engineering services with Fuller, Mossbarger, Scott, and May Engineers, Inc., for the Skyline Drive Stormwater System Improvements Project.

This contract modification is necessary to allow payment for additional engineering services that are beyond the original contract scope. Additional engineering services are needed to relocate an existing waterline along Skyline Drive, provide additional storm sewers along both sides of Skyline Drive, and compensate the consultant for project delays associated with reconnection of county home septic disposal systems into the new storm sewer system. The conflict with the waterline could not be foreseen prior to design since the exact location of the new storm sewer
system and associated roadside swales were unknown at the time of scope development. Videotaping of the existing storm sewers performed during design revealed that storm sewers along both sides of Skyline Drive instead of along one side as proposed in the original contract is warranted to reconnect existing roof drains and sump pumps. Delays to the contract resulted from discussions with the Franklin County Board of Health about impacts to home septic
disposal systems that will remain in the county once this project is complete.

BID INFORMATION. To select this firm originally, a Notice of Request for Statements of Qualifications appeared in the City Bulletin on November 4 and 11, 2000. Statements of Qualifications were received on December 29, 2000. Thirty-four consultants submitted Statements of Qualifications. Three consultants were selected to submit technical proposals for this project. These proposals were received on May 2, 2001. Based upon an evaluation of these proposals utilizing predetermined criteria, a selection committee determined that Fuller, Mossbarger, Scott, and May Engineers, Inc. had submitted the best proposal for the required project s...