File #: 1885-2023    Version: 1
Type: Ordinance Status: Passed
File created: 6/16/2023 In control: Public Utilities Committee
On agenda: 7/24/2023 Final action: 7/26/2023
Title: To authorize the Director of the Department of Public Utilities to renew the contract with Hazen and Sawyer for the Overall Engineering Consultant Design Modification; and to authorize an expenditure of up to $300,000.00 within the Sanitary Bond Fund to pay for the contract modification. ($300,000.00)
Indexes: WBE Participation
Attachments: 1. ORD 1885-2023 Accounting Template, 2. ORD 1885-2023 Utilization
Explanation

1. BACKGROUND: This ordinance authorizes the Director of Public Utilities to enter into a planned contract modification for professional engineering services with Hazen and Sawyer for the Overall Engineering Consultant (OEC) Design Modification #1, CIP #650025-100001, in an amount up to $300,000.00.

This Engineering Agreement is necessary to provide technical and engineering assistance to the City and its design professionals in planning and coordination of the work. This work is part of the City’s continuing program to improve its sewer collection system and all related infrastructure, provide efficient, reliable, cost-effective operations, and enhance personnel safety. The OEC services are separated into several tasks, as follows:

Task 1 - Planning Services
Task 2 - Design Services
Task 3 - Construction Related Services
Task 4 - General and Additional Services
Task 5 - Project Management

The City will request a task order from the consultant as necessary work is identified. The task order will include a detailed scope of work, direct and indirect costs, task schedule, estimated hours, personal categories required with labor rates, and reimbursable expenses. After negotiation and upon acceptance by the city, the consultant shall commence with said work. The Engineer shall provide such professional engineering services as may be necessary to accomplish the work required to be performed and shall at the firm’s cost, furnish all necessary competent personnel, equipment, and materials to perform the work.

This serves multiple planning areas so this project is coded as “99 - Citywide”.

1.1 Amount of additional funds to be expended: $300,000.00
Original Contract Amount: $300,000.00 (Ord. 0226-2022 PO317358)
Modification #1 Amount: $300,000.00 (Current)
Proposed Modification #2 (2024 funding) $300,000.00 (Future)
Total (Orig. + Modification/Modification): $900,000.00

1.2. Reason other procurement processes are not...

Click here for full text