Explanation
1. BACKGROUND
This ordinance authorizes the Director of Public Service to modify and increase an existing contract with Complete General Construction Company for the Bridge Rehabilitation - Whittier Street Bridge Rehab and SUP Widening project in an amount up to $100,000.00.
Ordinance 3243-2023 authorized the Director of Public Service to enter into a contract with Complete General Construction Company for the construction of the Bridge Rehabilitation - Whittier Street Bridge Rehab and SUP Widening project and to provide for construction administration and inspection services.
The work performed to date for this project consists of rehabilitation of the Whittier Street Bridge over CSX and NS Railroads and the approach roadway work necessary for the widening of the existing sidewalk into a 10-foot-wide shared use path (SUP) between Front Street and 1250 feet west of Front Street at the existing Scioto River Trail access point.
The work for modification 1 will consist of a bridge deck overlay of the Whittier Street bridge along with the associated mobilization and maintenance of traffic. The work is expected to take 30 days and will be scheduled with the remaining work on the contract., and other such work as may be necessary to complete the contract.
1.1 Amount of additional funds to be expended: $100,000.00
The original contract amount: $3,311,062.04 (PO432311/PO432325, Ord. 3243-2023)
The total of Modification No. 1: $100,000.00 (This Ordinance)
The contract amount including all modifications: $3,411,062.04
1.2 Reasons additional goods/services could not be foreseen:
This was not an anticipated modification. During the course of construction, it was determined that the bridge deck was in a worse condition than it was at the time of project scoping. A bridge deck overlay is now required to extend the life of the bridge deck and preserve the bridge long term.
1.3 ...