Title: To authorize the Director of Public Service to execute a construction contract modification with Complete General Construction Inc. in connection with the Lockbourne Road improvement project; to authorize the transfer of funds from the Water Works Enlargement Voted Bonds Fund to the State Issue Two Street Projects Fund; to appropriate funds within the State Issue Two Street Projects Fund; to authorize the expenditure of $433,998.00 from the State Issue Two Street Projects Fund for this construction contract mod and inspection; to amend the 2010 Capital Improvements Budget; and to declare an emergency. ($433,998.00)
Attachments: 1. 0821-2010 Utilization Information.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
6/23/20101 CITY CLERK Attest  Action details Meeting details
6/22/20101 MAYOR Signed  Action details Meeting details
6/21/20101 Columbus City Council ApprovedPass Action details Meeting details
6/21/20101 COUNCIL PRESIDENT PRO-TEM Signed  Action details Meeting details
6/17/20101 City Clerk's Office Sent back for Clarification/Correction  Action details Meeting details
6/17/20101 Service Drafter Sent for Approval  Action details Meeting details
6/17/20101 CITY AUDITOR Reviewed and Approved  Action details Meeting details
6/17/20101 Service Drafter Sent to Clerk's Office for Council  Action details Meeting details
6/11/20101 Service Drafter Sent for Approval  Action details Meeting details
6/11/20101 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
6/11/20101 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
6/10/20101 EBOCO Reviewer Sent for Approval  Action details Meeting details
6/10/20101 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
6/9/20101 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
6/9/20101 Service Drafter Sent for Approval  Action details Meeting details
6/7/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
6/7/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
6/7/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
6/3/20101 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
6/3/20101 Utilities Drafter Sent for Approval  Action details Meeting details
6/3/20101 Utilities Drafter Sent for Approval  Action details Meeting details
6/2/20101 Utilities Reviewer Sent for Approval  Action details Meeting details
6/1/20101 Utilities Drafter Sent for Approval  Action details Meeting details
6/1/20101 Utilities Reviewer Reviewed and Approved  Action details Meeting details
6/1/20101 Utilities Drafter Sent for Approval  Action details Meeting details
5/28/20101 Utilities Reviewer Reviewed and Approved  Action details Meeting details
5/27/20101 Utilities Drafter Sent for Approval  Action details Meeting details
5/27/20101 Utilities Drafter Sent for Approval  Action details Meeting details
5/26/20101 Service Reviewer Reviewed and Approved  Action details Meeting details
5/26/20101 Service Drafter Sent for Approval  Action details Meeting details
5/26/20101 SERVICE DIRECTOR Reviewed and Approved  Action details Meeting details
Explanation

1. BACKGROUND
The City of Columbus, Department of Public Service, Division of Design and Construction, and the Department of Public Utilities Division of Sewerage and Drainage and Division of Power and Water, are engaged in the Lockbourne Road Improvement project.

This legislation authorizes the Director of Public Service to modify and increase this contract for the Lockbourne Road Improvement project with Complete General Construction, Inc., in the amount of $433,998.00.

This modification is necessary because the condition of the existing 12" water line on the northern portion of the project was not as good as anticipated based on date of installation, and needed to be replaced to avoid future breaks and subsequent repairs.

The purpose of this project is to widen Lockbourne Road from two to three lanes, install sidewalks, curbs, storm sewerage, water lines, and lighting. The project limits are Lockbourne Road from Groveport Road to S.R. 104; Koebel Road from Lockbourne Road to Fairwood Avenue; and approximately 1000 feet on Evergreen Road east of Lockbourne Road. The project will also construct a sanitary sewer system. At the present time there is no sanitary system in the immediate area, and the project will address Health Department and EPA mandates. There are no existing sidewalks. The project will add these, as well as a bicycle path in the widened roadway section.

As part of this project, 2.16 miles of 5 foot wide sidewalk will be constructed on the east and west sides of Lockbourne Road, and also on the north and south sides of Koebel Road; 47 ADA ramps will be added or reconstructed. There are 3 bus stops and transit routes within the limits of this project. The project complies with the recommendation of the Pedestrian Thoroughfare Plan (PTP) because it complies with the recommended 5 foot sidewalk width for a roadway with these characteristics. The installation of curb provides additional protection for pedestrians....