File #: 2866-2022    Version: 1
Type: Ordinance Status: Passed
File created: 10/18/2022 In control: Public Utilities Committee
On agenda: 11/14/2022 Final action: 11/16/2022
Title: To authorize the Director of Public Utilities to modify an existing engineering agreement with Black & Veatch Corporation for the Lockbourne Intermodal Subtrunk (LIS) Air Quality Improvements project; to authorize the transfer within of up to $76,880.69 and the expenditure of up to $76,880.69 from the Sanitary Sewer Obligation Bond Fund for the Division of Sewerage and Drainage, and to amend the 2022 Capital Improvement Budget. ($76,880.69)
Attachments: 1. Ord 2866-2022 Information, 2. Ord 2866-2022 Utilization, 3. Ord 2866-2022 Funding
Explanation

BACKGROUND: This legislation authorizes the Director of Public Utilities to modify an existing engineering agreement with Black & Veatch Corporation for the Lockbourne Intermodal Subtrunk Air Quality Improvements project, CIP 650491-100005. As part of the Northern Pickaway Joint Economic Development District (JEDD) agreement the City of Columbus agreed to construct the sanitary sewer infrastructure necessary to serve the district. A majority of that area will be served via the 60-78” Lockbourne Intermodal Subtrunk Sewer (LIS). During the design of this sub-trunk, a preliminary ventilation and odor control study conducted by HWS (Harvey W. Sorensen) in September of 2013 determined that air quality control would be required in order to prevent odor releases and pressurizing of the sanitary system. To date, the consultant has completed the project design, bidding phase and has conducted 30 months of engineering services during construction.

This project is located in the 64 - Far South Columbus Community.

Modification Information: Amount of additional funds: $76,880.69

Initial Contract $576,425.09 (EL017419)
Modification #1 $159,049.49 (PO152911)
Modification #2 $157,348.10 (PO287172)
Modification #3 $76,880.69 (Current)
TOTAL $969,703.37

Reasons additional goods/services could not be foreseen:
The main driver for this modification is due to the lack of progress of the contractor. The Contractor was given notice to proceed with the construction on this contract on May 7, 2020. The Substantial Completion Date for the project was January 2, 2021. While the contractor did begin submittals and some minor site activities, they did not mobilize to the site fully until January 18, 2021. The Contractor was granted an extension of the Substantial Completion date until October 22, 2021. However, the Contractor has not yet started the Operational Demon...