Explanation
This ordinance authorizes the Director of the Recreation and Parks Department to modify the contract with Kramer Engineers for engineering services to make renovations to the existing Ponds and Cascades at Franklin Park.
Background: Phase I work included engineering services associated with the new pump house that currently operates the cascades. The original Phase II scope addressed the cascades between the two ponds. Understanding that the ponds are failing, this modification expands the Consultant’s scope of design services to include the improvements to both the upper and lower ponds. A simultaneous design of both pond renovations with the cascades will allow for a uniform engineered plan that addresses the failing system as a whole. Additionally, including the pond work with the cascade renovations will allow a single contractor to complete the project in the 2019 construction season.
Principal Parties:
Kramer Engineers
394 Oak Street
Columbus, OH, 43215
Ralph Kramer, 614-233-6911
CCN: 31-1035777
August 23, 2019
Benefits to the Public: Project aims to renovate and maintain unique and sustainable amenities for public enjoyment and to enhance educational opportunities.
Community Input/Issues: Public requests to reactivate the cascades and water features in the park that have not had water flow since spring 2016.
Area(s) Affected: Franklin Park Civic Association, Near East side Area Commission (Planning Area 19)
Master Plan Relation: This project supports the Master Plan by improving overall maintenance, safety and design, preserving a percentage of park area in a natural state to increase wildlife habitat and reduce maintenance costs. Also expanding offerings and amenities to appear to a more diversified audience and user group (outdoor education).
Fiscal Impact: The expenditure of $148,500.00 was legislated for the Franklin Park Cascades Design contract by Ordinance 2866-2016. This ordinance will provide ...