Legislation Details

File #: 2960-2026    Version: 1
Type: Ordinance Status: Second Reading
File created: 10/16/2026 In control: Public Utilities & Sustainability Committee
On agenda: 11/23/2026 Final action:
Title: To authorize the Director of Columbus Water and Power to enter into a professional engineering services contract with Arcadis U.S., Inc. for the Sewer System Capacity Model 2026 project; to authorize a transfer of cash and appropriation; to authorize an expenditure up to $1,344,755.28 from the Sanitary Bond Fund, and to declare an emergency. ($1,344,755.28)
Indexes: MBE Participation, WBE Participation
Attachments: 1. ORD 2960-2026 Utilization Reporting Form, 2. ORD 2960-2026 Accounting Template, 3. ORD 2960-2026 SOS
Date Ver.Action ByActionResultAction DetailsMeeting Details
No records to display.
Explanation
1. BACKGROUND
This ordinance authorizes the Director of Columbus Water and Power to enter into a professional engineering services contract awarded through the City’s Request for Proposal process with Arcadis U.S., Inc., for the Sewer System Capacity Model Update 2026, CIP 650460-100003, in an amount up to $1,344,755.28.

Columbus Water and Power (CWP), Division of Water Reclamation (DWR), has identified the need to provide additional Professional Engineering Services to refine the system-wide sanitary and combined sewer collection system model, perform model applications including capacity evaluation and sewer system operations, flow monitoring with data management/analysis, provide support to Blueprint Columbus / 2015 Integrated Plan and Wet Weather Management Plan Update.
This project will continue development of the City's Sewer System Capacity Model (SSCM). SSCM plays a vital role in evaluating capacity deficiencies and devising economical solutions to those deficiencies. This project is necessary to ensure continued compliance with Ohio EPA SSO and CSO Consent Orders and to continue the City's commitment to eliminating sanitary sewer overflows (SSO's) and minimizing Water-in-Basement occurrences (WIB's). It is anticipated that this project will update the current SSCM with the most current collection system configuration; upgrade portions of its method of calculation to increase its accuracy; enhance its usability and operations; and apply the SSCM Update to new development, performance, and operational conditions.
Community Planning Area: 99 - Citywide
TIMELINE:
The contract is expected to begin in December 2026 and receive annual modifications in 2027, 2028, 2029, 2030.

ESTIMATED COST OF PROJECT:
The original contract amount will be $1,344,755.00. The proposed award amount is $1,344,755.28, including a 20% contingency amount that will be utilized to fund needed and approved changes in the work. Four modifications are anticipated at th...

Click here for full text