header-left
File #: 1316-2007    Version: 1
Type: Ordinance Status: Passed
File created: 8/10/2007 In control: Utilities Committee
On agenda: 9/10/2007 Final action: 9/13/2007
Title: To authorize the Director of Public Utilities to enter into a contract with VEC Systems, Inc., for repair of wellhouse roofs for the Division of Power and Water, to authorize the expenditure of $129,605.00 from the Waterworks Enlargement Voted 1991 Bonds Fund, , to amend the 2007 C.I.B. and to authorize the City Auditor to transfer funds within the Waterworks Enlargement Voted 1991 Bonds Fund and to declare an emergency. ($129,605.00)
Attachments: 1. PAWP_VicMap.pdf, 2. BIDTAB- Aug 1 2007.pdf, 3. Quality Factors Evaluation Form- 8-1-07.pdf, 4. 2 BID-DOC Advertisement.pdf, 5. Information to be included in Contracting Legislation PAWP Wellhouse Roof Replac.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
9/13/20071 CITY CLERK Attest  Action details Meeting details
9/12/20071 MAYOR Signed  Action details Meeting details
9/10/20071 Columbus City Council ApprovedPass Action details Meeting details
9/10/20071 COUNCIL PRESIDENT Signed  Action details Meeting details
8/31/20071 Auditor Reviewer Reviewed and Approved  Action details Meeting details
8/31/20071 CITY AUDITOR Reviewed and Approved  Action details Meeting details
8/31/20071 Utilities Drafter Sent for Approval  Action details Meeting details
8/31/20071 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
8/31/20071 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
8/30/20071 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
8/30/20071 Utilities Drafter Sent for Approval  Action details Meeting details
8/27/20071 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
8/23/20071 Finance Reviewer Reviewed and Approved  Action details Meeting details
8/21/20071 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
8/21/20071 Utilities Drafter Sent for Approval  Action details Meeting details
8/17/20071 Utilities Drafter Sent for Approval  Action details Meeting details
8/17/20071 EBOCO Reviewer Sent for Approval  Action details Meeting details
8/15/20071 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
8/14/20071 Utilities Reviewer Sent for Approval  Action details Meeting details
8/13/20071 Utilities Reviewer Reviewed and Approved  Action details Meeting details
8/13/20071 Utilities Drafter Sent for Approval  Action details Meeting details
8/10/20071 Utilities Drafter Sent for Approval  Action details Meeting details
8/10/20071 Utilities Reviewer Reviewed and Approved  Action details Meeting details
8/10/20071 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: The existing roof areas for four Wellhouses at Parsons Avenue Water Plant (PAWP) were originally constructed in the early 1980's; they are in need of rehabilitation. In order to prevent damage to the building and equipment, these roofs need to be removed and replaced.

The procurement of this contract was conducted in accordance with Section 329.09 of the Columbus City Code.

Competitive bids were received and opened at the office of the Director of Public Utilities on August 1, 2007. Four (4) bids were received. Of the four (4) bids received, the lowest responsive and responsible and best bidder was VEC Systems, Inc. The bid of K & W Roofing, Inc. was deemed to be non-responsive due to no dollar amount (or percentage) filled in on the proposal bond form and therefore not a valid Proposal Bond in accordance with CMSC 102.08. The bid of General Maintenance & Engineering was non-responsive due to failure to provide a proposal bond amount of not less than 10% of their bid in accordance with CMSC 102.08. The bid of Field and Associates was non-responsive due to not including the entire Bid Submittal Document in accordance with CMSC 102.07.

BIDDER AMOUNT
K & W Roofing, Inc. non-responsive
General Maintenance & Engineering Co. non-responsive
Field and Associates, Inc. non-responsive
VEC Systems, Inc. $129,605.00


FISCAL IMPACT: There is sufficient funding available in the Water Works Enlargement Voted 1991 Bonds Fund.

CONTRACT COMPLIANCE NUMBER: 04-3702089, effective through 9/27/07, Majority Firm.

EMERGENCY PROVISION: Emergency legislation is being requested to take advantage of the remaining 2007 construction season and to implement the repairs as soon as possible to eliminate water leakage into the existing facilities.



Title

To authorize the Director of Public Utilities to enter into a contract with VEC Systems, Inc., for repair of wellhouse roofs for the Division of Power and Wat...

Click here for full text