File #: 1700-2008    Version: 1
Type: Ordinance Status: Passed
File created: 10/21/2008 In control: Utilities Committee
On agenda: 11/10/2008 Final action: 11/12/2008
Title: To authorize the Director of Public Utilities to modify and increase the professional engineering services contract with Malcolm Pirnie, Inc. for the Dublin Road Water Plant Raw Water Intake Improvements Project; to authorize the appropriation and transfer of $178,200.00 from the Water System Reserve Fund to the Water Works Enlargement Voted Bonds Fund; to authorize the expenditure of $178,200.00 from the Water Works Enlargement Voted Bonds Fund; for the Division of Power and Water; and to declare an emergency. ($178,200.00)
Attachments: 1. ORD1700-2008 mod request.pdf, 2. ORD1700-2008 map.pdf, 3. ORD1700-2008 Legis. Info. Form.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
11/12/20081 MAYOR Signed  Action details Meeting details
11/12/20081 CITY CLERK Attest  Action details Meeting details
11/10/20081 Columbus City Council ApprovedPass Action details Meeting details
11/10/20081 COUNCIL PRESIDENT Signed  Action details Meeting details
10/29/20081 Auditor Reviewer Reviewed and Approved  Action details Meeting details
10/29/20081 CITY AUDITOR Reviewed and Approved  Action details Meeting details
10/29/20081 Utilities Drafter Sent for Approval  Action details Meeting details
10/29/20081 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
10/29/20081 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
10/28/20081 Utilities Drafter Sent for Approval  Action details Meeting details
10/28/20081 Finance Reviewer Reviewed and Approved  Action details Meeting details
10/28/20081 Finance Reviewer Reviewed and Approved  Action details Meeting details
10/28/20081 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
10/28/20081 Utilities Drafter Sent for Approval  Action details Meeting details
10/27/20081 Utilities Reviewer Sent for Approval  Action details Meeting details
10/27/20081 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
10/27/20081 Utilities Drafter Sent for Approval  Action details Meeting details
10/27/20081 EBOCO Reviewer Sent for Approval  Action details Meeting details
10/27/20081 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
10/24/20081 Utilities Drafter Sent for Approval  Action details Meeting details
10/24/20081 Utilities Drafter Sent for Approval  Action details Meeting details
10/22/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
10/22/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
10/21/20081 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: This Ordinance authorizes the Director of Public Utilities to modify and increase the professional engineering services contract with Malcolm Pirnie, Inc. for the Dublin Road Water Plant Raw Water Intake Improvements Project, Division of Power and Water Contract No. 1052.

This modification will provide for additional engineering and professional services including Construction Administration/Construction Inspection services that were beyond the scope of the original contract including: the rehabilitation of the south abutment of the low-head dam, dewatering issues encountered during construction, low-head dam repairs and the leaf chute extension, amongst other miscellaneous items contained within the attached modification request letter submitted by Malcolm Pirnie. These changes were not originally anticipated or included in the original project scope but were implemented after site conditions were fully assessed and dewatered.

1. Amount of additional funds to be expended: $178,200.00
Original Contract Amount: $564,182.00
Amount of Modification #1: $436,982.00
Amount of Modification #2: $178,200.00
Amount of original contract and two modifications: $1,179,364.00

This requested modification is an 18% increase in the original contract and includes 10% contingency of $16,200.00.

2. Reasons additional goods/services could not be foreseen:
The South abutment of the low-head dam deteriorated beyond the original scope of repairs due to the unseasonably wet June '08. These high flows and the force of the river significantly damaged the South abutment requiring additional design efforts. Due to evaluations by the DPU Regulatory Compliance section, modifications to the leaf chute design were mandated. Additional efforts were required on the low-head dam since the true extent of the repairs could not be fully evaluated until the cofferdam was in place and the site adequately dewate...

Click here for full text