Explanation
1. BACKGROUND:
This legislation authorizes the Director of Public Utilities to modify an existing professional engineering services contract for the Chestnut and Sixth Street Combined Sewer Rehabilitation and Naghten Street Storm Sewer Projects with the Ribway Engineering Group, Inc. The remaining portion of this contract consists of final plan development, engineering services during construction, and final record planning.
This modification (Mod #1) will increase the funding of the contract by an additional $138,195.00. Proposed future modifications plans and specifications are being finalized and an advertisement for the construction contract bid will occur this fall.
The original contract for Ribway Engineering Group, Inc. was for professional services for the rehabilitation of Chestnut & Sixth Street combined sewer project, as well the installation of a connecting 72-inch diameter storm sewer within Naghten Street.
1.1. Amount of additional funds to be expended: $138,195.00
Original Contract Amount: $578,813.00
Proposed Modification #1: $138,195.00
Proposed Future Modifications: $00.00
Proposed Total Amount: $717,008.00
1.2. Reasons additional goods/services could not be foreseen:
Additional coordination for easements and plan development related to the construction of ADA ramps and maintenance of traffic plans resulted in significantly more effort than anticipated in the original contract scope.
1.3. Reasons why the contract modification could not be bid out.
To use an existing professional engineering contract specifically for the rehabilitation of Chestnut & Sixth Street combined sewer project, as well the installation of a connecting 72-inch diameter storm sewer within Naghten Street. Also, in order to timely bid and award a construction contract using WPCLF/OWDA loan and stimulus funds through the (American Recovery and Reinvestment Act).
1.4. How cost of modification was determi...