Title: To authorize the Director of Public Utilities to modify an existing professional engineering contract for the Chestnut and Sixth Street Combined Sewer Rehabilitation and Naghten Street Storm Sewer Projects with the Ribway Engineering Group, Inc.; to authorize the transfer and appropriation of $138,195.00 from the Sanitary Sewer Reserve Bond Fund to the Voted Sanitary Sewer Bond Fund; to authorize the expenditure of $138,195.00 from within the Voted Sanitary Sewer Bond Fund; for the Division of Sewerage and Drainage. ($138,195.00)
Attachments: 1. Director's Legislation Information Sheet - Updated as of 4-3-091.pdf, 2. Request for CIP Legislation Form (Revised 7-26-07) (650618).doc 070109, 3. 650618 Map.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
7/29/20091 CITY CLERK Attest  Action details Meeting details
7/28/20091 MAYOR Signed  Action details Meeting details
7/27/20091 Columbus City Council ApprovedPass Action details Meeting details
7/27/20091 COUNCIL PRESIDENT PRO-TEM Signed  Action details Meeting details
7/20/20091 Columbus City Council Read for the First Time  Action details Meeting details
7/10/20091 Auditor Reviewer Reviewed and Approved  Action details Meeting details
7/10/20091 CITY AUDITOR Reviewed and Approved  Action details Meeting details
7/10/20091 Utilities Drafter Sent for Approval  Action details Meeting details
7/10/20091 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
7/10/20091 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
7/9/20091 Utilities Drafter Sent for Approval  Action details Meeting details
7/8/20091 Finance Reviewer Reviewed and Approved  Action details Meeting details
7/8/20091 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
7/8/20091 Utilities Drafter Sent for Approval  Action details Meeting details
7/8/20091 EBOCO Reviewer Sent for Approval  Action details Meeting details
7/8/20091 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
7/7/20091 Utilities Reviewer Sent for Approval  Action details Meeting details
7/7/20091 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
7/7/20091 Utilities Drafter Sent for Approval  Action details Meeting details
7/7/20091 Finance Reviewer Reviewed and Approved  Action details Meeting details
7/6/20091 Utilities Reviewer Reviewed and Approved  Action details Meeting details
7/2/20091 Utilities Drafter Sent for Approval  Action details Meeting details
7/2/20091 Utilities Reviewer Reviewed and Approved  Action details Meeting details
7/2/20091 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

1. BACKGROUND:
This legislation authorizes the Director of Public Utilities to modify an existing professional engineering services contract for the Chestnut and Sixth Street Combined Sewer Rehabilitation and Naghten Street Storm Sewer Projects with the Ribway Engineering Group, Inc. The remaining portion of this contract consists of final plan development, engineering services during construction, and final record planning.

This modification (Mod #1) will increase the funding of the contract by an additional $138,195.00. Proposed future modifications plans and specifications are being finalized and an advertisement for the construction contract bid will occur this fall.

The original contract for Ribway Engineering Group, Inc. was for professional services for the rehabilitation of Chestnut & Sixth Street combined sewer project, as well the installation of a connecting 72-inch diameter storm sewer within Naghten Street.

1.1. Amount of additional funds to be expended: $138,195.00
Original Contract Amount: $578,813.00
Proposed Modification #1: $138,195.00
Proposed Future Modifications: $00.00
Proposed Total Amount: $717,008.00

1.2. Reasons additional goods/services could not be foreseen:
Additional coordination for easements and plan development related to the construction of ADA ramps and maintenance of traffic plans resulted in significantly more effort than anticipated in the original contract scope.

1.3. Reasons why the contract modification could not be bid out.
To use an existing professional engineering contract specifically for the rehabilitation of Chestnut & Sixth Street combined sewer project, as well the installation of a connecting 72-inch diameter storm sewer within Naghten Street. Also, in order to timely bid and award a construction contract using WPCLF/OWDA loan and stimulus funds through the (American Recovery and Reinvestment Act).

1.4. How cost of modification was determi...

Click here for full text