Explanation
1. BACKGROUND
This ordinance authorizes the Director of Public Utilities to enter into a contract modification with Hazen and Sawyer for professional engineering services for the Fourth Water Plant project, CIP #690600-100000, in an amount up to $55,617,700.00.
The Fourth Water Plant (FWP) project will design and construct a new water plant to meet water supply needs and increase the resiliency and reliability of the water supply system. The FWP site will be located on City owned property in Delaware County, Concord Township, at the southeast corner of Dublin Road (S.R. 745) and Home Road (C.R. 124).
Work performed to date includes Study Services (Phase 1) and Preliminary Design Services (Phase 2). The Phase 1 Study Services researched and evaluated options related to the new water plant and developed a basis of design for the recommended improvements. The project was further developed in Preliminary Design. The preliminary design process advanced the study phase by determining process components, evaluated technology alternatives and developed the design components contained in the final Preliminary Design Report. This report includes: permitting efforts, site/civil design, process design, opinion of probable construction cost, and project schedule updates. The Preliminary Design Report, prepared in this phase, serves as the foundation for developing the detailed design documents in the next phase of design.
This modification provides funding for Detailed Design Services (Phase 3), which will develop detailed design drawings for the main plant project and will also provide funding for engineering services during construction for two of the FWP subprojects, the Site Preparation project and the Electrical Substation project.
It is the City’s intent to execute future contract modifications for Engineering Services During Construction for the rest of the plant construction needs.
Planning area = “99-Citywide”
TIMELINE & FUTURE MODIFICATIO...