header-left
File #: 0593-2007    Version: 1
Type: Ordinance Status: Passed
File created: 4/4/2007 In control: Utilities Committee
On agenda: 6/4/2007 Final action: 6/11/2007
Title: To authorize the Director of Public Utilities to execute a construction contract with Reynolds Inliner, LLC, in connection with the Broad Meadows Area Sanitary Improvements Project; to authorize the appropriation, transfer, and expenditure of $912,410.80 from the Sewer System Reserve Fund to the Ohio Water Development Authority Loan Fund; for the Division of Sewerage and Drainage; and to declare an emergency. ($912,410.80)
Attachments: 1. ORD NO. 0593-2007 674 BID TAB (02-07).pdf, 2. ORD NO. 0593-2007 QUAL EVAL SSES.pdf, 3. ORD NO. 0593-2007 MAP 674.pdf, 4. ORD. NO. 0593-2007 CIP 674 REQ FOR LEG INFO.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
6/11/20071 CITY CLERK Attest  Action details Meeting details
6/8/20071 MAYOR Signed  Action details Meeting details
6/4/20071 Columbus City Council ApprovedPass Action details Meeting details
6/4/20071 COUNCIL PRESIDENT Signed  Action details Meeting details
5/17/20071 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
5/16/20071 CITY AUDITOR Reviewed and Approved  Action details Meeting details
5/16/20071 Utilities Drafter Sent for Approval  Action details Meeting details
5/16/20071 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
5/15/20071 Auditor Drafter Sent for Approval  Action details Meeting details
5/15/20071 Auditor Reviewer Reviewed and Approved  Action details Meeting details
5/9/20071 Auditor Reviewer Reviewed and Approved  Action details Meeting details
5/8/20071 Utilities Drafter Sent for Approval  Action details Meeting details
5/7/20071 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
5/3/20071 Utilities Drafter Sent for Approval  Action details Meeting details
5/3/20071 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
5/2/20071 Finance Reviewer Reviewed and Approved  Action details Meeting details
5/2/20071 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
5/1/20071 Finance Reviewer Reviewed and Approved  Action details Meeting details
4/27/20071 Utilities Drafter Sent for Approval  Action details Meeting details
4/26/20071 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
4/25/20071 Utilities Reviewer Sent for Approval  Action details Meeting details
4/19/20071 Utilities Reviewer Reviewed and Approved  Action details Meeting details
4/18/20071 Utilities Drafter Sent for Approval  Action details Meeting details
4/18/20071 Utilities Drafter Sent for Approval  Action details Meeting details
4/17/20071 Utilities Drafter Sent for Approval  Action details Meeting details
4/17/20071 Utilities Reviewer Reviewed and Approved  Action details Meeting details
Explanation
1. BACKGROUND: This legislation authorizes the Director of Public Utilities to execute a contract with the Reynolds Inliner, LLC, in the amount of $912,410.80 for the construction of one sanitary sewer improvement project.

This legislation authorizes the Director of Public Utilities to execute a contract with Reynolds Inliner, LLC, for the construction of the Broad Meadows Area Sanitary Improvements Project. This project will repair and rehabilitate approximately 9,525 lineal feet of 8-inch diameter, 460 LF of 10-inch diameter, 701 LF of 12-inch diameter and 360 LF of 15-inch diameter sanitary sewer pipe using the Cured-in-Place Pipe (CIPP) process; the installation of approximately 340 LF of 15-inch diameter sanitary sewer pipe; the dye testing of approximately 9 service connections; the reinstatement of approximately 276 service connections; the rehabilitation of approximately 481 VF of brick and pre-cast concrete manholes utilizing a cementitious lining system; the installation of 1 sanitary sewer manhole; the rehabilitation of 47 manhole bench and channels; the replacement of 48 manhole frames and covers; the open cut replacement of 53 LF of 8-inch sanitary sewer pipe in seven (7) locations; the by-pass pumping, maintaining traffic, and other such work as may be necessary to complete the contract in accordance with the plans (CC-14509) and specifications. This project will utilize trenchless technology methods to minimize the disruption to residences in the project area and to avoid the costlier method of traditional open trench sewer removal and replacement.

The Director of Public Utilities publicly opened five competitive bid proposals on February 28, 2007. The result of this bid was that Kokosing Construction Company submitted a bid of $985,245.17; Insituform (MO) submitted a bid of $895,097.24; Visu-Sewer Clean and Seal submitted a bid of $1,002,121.69; Performance Site Company, LLC, submitted a bid of $1,608,559.57 and Reynold...