Explanation
Background: This ordinance authorizes the Public Service Director to increase a design contract in the amount of $74,021.16 for the Transportation Division with Ralph and Curl Engineers. Seventeen (17) arches were installed over North High Street as part of the Short North Arch project. This project was funded by a combination of city money and funding from private sources. The private funds were deposited into the Short North Special Improvement District Fund. Construction was authorized by Ordinance 0144-2001 passed by City Council on January 29, 2001.
Arch installation was completed by December 2002. The fiber optic system lighting system has not operated properly and/or consistently since its initial two-week burn-in period. After working with the original designer to make the original system operational the City engaged the services of another designer, Ralph and Curl Engineers, to either validate the original design or prepare a new design that would assure the required long term operational status of the lighting system. A $87,260.00 contract with Ralph and Curl was authorized by Ordinance 0118-2004 passed by City Council on February 2, 2004.
A new design was determined to be necessary. Included in Ralph and Curl's scope of services was field-testing the new design prior to beginning re-construction. Their contract included $18,000.00 for field-testing; this allowed for testing one system on one arch. After some consideration the City has decided to test four lighting alternatives including (1) installing new illuminators and reusing the existing fiber optic cable; (2) installing new illuminators and new fiber optic cable; (3) using light-emitting diode (LED) lighting and (4) using incandescent light bulbs. A fifth option (using a LED light bulb in conjunction with incandescent light bulbs) would not alter the cost of the testing. Ralph and Curl, working with the original contractor The Righter Company and their sub-consu...
Click here for full text