File #: 3128-2023    Version: 1
Type: Ordinance Status: Passed
File created: 11/2/2023 In control: Public Utilities Committee
On agenda: 12/11/2023 Final action: 12/14/2023
Title: To authorize the Director of the Department of Public Utilities to enter into a construction contract with Shelly and Sands, Inc., for the Roosevelt Drive Area Water Line Improvements project; to authorize an amendment to the 2023 Capital Improvement Budget; to authorize a transfer of funds from the Water Reserve Fund to the Water Fresh Water Market Rate Fund; to authorize the appropriation of funds; and to authorize the expenditure of up to $3,746,932.40 from the Water Fresh Water Market Rate Fund and the Water Bond Fund. ($3,746,932.40)
Indexes: EBE Participation, WBE Participation
Attachments: 1. ORD 3128-2023 Accounting Template.pdf, 2. ORD 3128-2023 Utilization Reporting Form.pdf, 3. ORD 3128-2023 Vicinity Map.pdf
Explanation
1. BACKGROUND
This ordinance authorizes the Director of the Department of Public Utilities to enter into a construction contract with Shelly and Sands, Inc. for the Roosevelt Drive Area Water Line Improvements, CIP No. 690236-100123, in an amount up to $3,744,932.40, and to encumber funds with the Department of Public Service for prevailing wage services in an amount up to $2,000.00, for a total expenditure of $3,746,932.40.

Work consists of the rehabilitation of approximately 9,200 linear feet of 6-inch and 8-inch water mains, and other such work as may be necessary to complete the contract, in accordance with the drawings, technical specifications, special provisions, and City of Columbus Construction and Material Specifications as set forth in the Invitation For Bid (IFB). Work is to be performed on the following streets: the alley South of Bellwood Avenue; the alley South of Ruhl Avenue; Bellwood Avenue; North Roosevelt Avenue; Ruhl Avenue; Eastmoor Boulevard; Enfield Road; Hampshire Road; South Chesterfield Road; South Kellner Road; Templeton Road; and the alley north of East Main Street near South Chesterfield Road. .
The Community Planning Area is “57 - Mid East”.

TIMELINE
All work shall be complete within 270 calendar days from the Notice to Proceed. The City anticipates issuing a Notice to Proceed in February 2024.

ESTIMATED COST OF PROJECT
The bid amount and proposed award amount is $3,744,932.40, including a 10% construction contingency amount that will be utilized to fund needed and approved changes in the work. No contract modifications are anticipated at this time; however, construction exigency might later compel modification of this contract if unforeseen difficulties are encountered.

Cost summary:

Original Contract $3,744,932.40
Future Anticipated Needs $ 0.00
CONTRACT TOTAL $3,744,932.40
DPS Prevailing Wage Administration $ 2,000.00
$3,746,932.40

Constructi...