Explanation
Background: This ordinance authorizes the Director of the Recreation and Parks Department to modify the existing contract with CK Construction Group for the Kilbourne Run Sports Park Improvements Project. The modification amount is $215,000.00 with a contingency of $25,000.00. An additional $2,500.00 is being authorized for interdepartmental inspections and fees for a total of $242,500.00 being authorized by this ordinance.
Kilbourne Run Sports Park, located at 4625 Westerville Road, is a soccer specific facility that stretches over 62 acres with 35 of those acres dedicated to athletic space. This is a Construction Manager at Risk (CMR) Contract. This delivery method will save the project money and time compared to a traditional Design-Bid-Build delivery. This is one of a few planned modifications for the project's guaranteed maximum price. This modification will cover costs for Phase 2 construction which includes a traffic roundabout, park frontage, and signage.
This modification will include the addition of an 8-foot fence around the full-size grass fields 7, 8 and 9. There will also be a 4-foot fence around the full-size grass field 10. Fields 7, 8 and 9 are intended to be open to permit only usage and field 10 will be open to community play that does not require a permit. The additional work will also include renovation to the Kilbourne Run Gateway sign that was damaged by an errant vehicle. The original project completion date of the project was January 30, 2026. The modified project completion date, as a result of the proposed modification, will be September 1, 2026.
Amount of Additional Funds: $242,500.00
Why Additional Services Were Not Foreseen: Permanent fencing around the grass fields was not initially foreseen because the City did not predict the need to physically protect the field from errant motorized vehicles such as cars, 4-wheelers, and dirt bikes. Protecting the fields ensures the grass will successfully establish and increase t...
Click here for full text