header-left
File #: 1866-2008    Version: 1
Type: Ordinance Status: Passed
File created: 11/13/2008 In control: Utilities Committee
On agenda: 1/26/2009 Final action: 1/28/2009
Title: To authorize the Director of Public Utilities to modify and increase the professional engineering services contract with Korda/Nemeth Engineering, Inc. to design stormwater improvements within the Lenappe Drive, Canyon Drive, and Glenmont areas; to authorize the transfer and appropriation of $119,000.00 from the Storm Sewer Reserve Fund; to authorize the expenditure of $119,000.00 within the Storm Sewer Bond Fund; and to amend the 2008 Capital Improvements Budget; for the Division of Sewerage and Drainage. ($119,000.00)
Attachments: 1. ORD1866-2008 Legis. Info. Form.pdf, 2. ORD1866-2008 map.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
1/28/20091 CITY CLERK Attest  Action details Meeting details
1/27/20091 MAYOR Signed  Action details Meeting details
1/26/20091 Columbus City Council ApprovedPass Action details Meeting details
1/26/20091 COUNCIL PRESIDENT Signed  Action details Meeting details
12/15/20081 Columbus City Council Read for the First Time  Action details Meeting details
12/1/20081 Auditor Reviewer Reviewed and Approved  Action details Meeting details
12/1/20081 CITY AUDITOR Reviewed and Approved  Action details Meeting details
12/1/20081 Utilities Drafter Sent for Approval  Action details Meeting details
12/1/20081 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
12/1/20081 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
11/28/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/26/20081 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
11/26/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/26/20081 Finance Reviewer Reviewed and Approved  Action details Meeting details
11/26/20081 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
11/25/20081 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
11/25/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/25/20081 EBOCO Reviewer Sent for Approval  Action details Meeting details
11/24/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/24/20081 Utilities Reviewer Sent for Approval  Action details Meeting details
11/19/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/19/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
11/19/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/19/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/18/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
11/13/20081 Utilities Drafter Sent for Approval  Action details Meeting details
11/13/20081 Utilities Reviewer Reviewed and Approved  Action details Meeting details
11/13/20081 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: This Ordinance authorizes the Director of Public Utilities to modify and increase the Division of Power and Water's professional engineering services contract with Korda/Nemeth Engineering, Inc. for the Canyon Drive Area Water Line Improvements project.

The original agreement was for water line improvements only, however, the Division of Sewerage and Drainage would like to modify this agreement in order to design stormwater improvements within the Lenappe Drive, Canyon Drive, and Glenmont areas, where current water line improvements are occurring. It is advantageous to the Department of Public Utilities to combine these projects as it will reduce engineering, construction, and inspection costs as many of the improvements will overlap.

1. Amount of additional funds to be expended: $119,000.00
Original Contract Amount: $181,700.00
Modification 1 (current) $119,000.00
Amount of original contract and 1 modification: $300,700.00

2. Reasons additional goods/services could not be foreseen:
The consultant has already done survey work and preliminary design for the water main improvements in this area. It is advantageous for the Department of Public Utilities to combine these projects as it will ultimately reduce engineering, construction, and inspection costs as many of the improvements will overlap.

3. Reason other procurement processes are not used:
See number two above.

4. How cost of modification was determined:
A proposal from Korda/Nemeth Engineering, Inc. was submitted to the Division of Sewerage and Drainage. The proposal was reviewed and was deemed acceptable to the Division based on the scope of services provided.

Contract Compliance Information: 31-0922991, expires 9/28/09, Majority

FISCAL IMPACT: This Ordinance authorizes the transfer and appropriation of funds from the Storm Sewer Reserve Fund to the Storm Sewer Bond Fund for this expenditure as well as an amendment to the 2008 ...

Click here for full text