Title: To authorize the Director of the Department of Public Utilities to enter into a professional services contract modification with HDR Engineering, Inc. for the Kreiger Court Stormwater Improvements project; to authorize an amendment to the 2025 Capital Improvement Budget; to authorize the transfer of cash and appropriation within the Strom Sewer Bond Fund; and to authorize an expenditure of up to $61,432.44 from the Strom Sewer Bond Fund for the contract. ($61,432.44)
Attachments: 1. ORD 0139-2026 CIP 611037-100000, Krieger Court Stormwater Improvements Project Area Boundaries, 2. Ord 0139-2026 Funding Template - Krieger Court Mod 1.pdf, 3. ORD 0139-2026 HDR SOS, 4. ORD 0139-2026 Utilization form 2A-1 611037-100000
Explanation
1. BACKGROUND
This ordinance authorizes the Director of Public Utilities to enter into a professional services contract modification with HDR Engineering, Inc. for the Kreiger Court Stormwater Improvements, CIP 611037-100000, in an amount up to $61,432.44.

The Krieger Court basin was originally designed and constructed in 1972 and 1974 respectively. At the time of the design, the basin’s tributary area was approximately 65 acres. Over time, the tributary area has increased to approximately 145 acres. The scope of work for this Project is to evaluate existing reports and confirm existing storm sewer and basin conditions through field investigations and survey. Design recommendations shall be made to mitigate upstream drainage issues, improve the functionality of the basin, and convey basin discharge following requirements stated in the City’s Stormwater Drainage Manual.

The consultant completed the following detailed scope items: Review Existing Information; perform field investigations, surveys, site visits, and research necessary to prepare any required site plans, H&H analysis, construction plans, preliminary design report and easements; televised and cleaned necessary storm sewers; provided a hydrologic and hydraulic analysis; prepared a draft and final preliminary design report; completed all field survey; prepared all temporary/permanent easements; completed a geotechnical investigation; drafted construction drawings and specifications through final signature stage.

Under this modification, the consultant shall provide bid documents and assistance during the bid phase, prepare any outstanding FAA permits, provide engineering services during construction, and prepare record drawings.

The Community Planning Area is 52 - Westland

1.1 Amount of additional funds to be expended: $61,432.44
Original Contract Amount: $646,821.68 (ORD 1774-2019; PO189362)