Explanation
1. BACKGROUND: This legislation authorizes the Director of Public Utilities to enter into a construction contract with Alumni Roofing Co., Inc., in the amount of $542,190.00, for the Parsons Avenue Water Plant (PAWP) Roof Restoration Project, Division of Power and Water Contract Number 1197.
This project consists of furnishing all materials, equipment, and labor necessary to provide for the installation of high performance urethane coating roofing restoration system over a properly mineralized built-up roof system and miscellaneous metal flashing at the Parsons Avenue Water Plant.
This construction project will stop the water leakage into the Filter Building at the plant as well as restore the integrity of the roof over multiple buildings at the PAWP including the Control Building, Chemical Building, Maintenance Building, Finished Water Pump Station, and Headhouse. Completed work will provide a manufacturer's 15-year labor and material warranty.
2. ECONOMIC IMPACT/ADVANTAGES; COMMUNITY OUTREACH; PROJECT DEVELOPMENT; ENVIRONMENTAL FACTORS/ADVANTAGES OF PROJECT: This project is necessary to meet infrastructure needs at the Parsons Avenue Water Plant (PAWP). The PAWP is an essential and integral component in the Columbus area water supply and treatment infrastructure. Adequate safe supply of water is essential to economic growth and development.
Public informational meetings are not anticipated for this project, all proposed work is within the boundaries of the water treatment facility.
The roof restoration product being utilized is a highly reflective waterproofing membrane, "White-Knight Plus". The high solar reflectance of the coating will reduce energy usage compared to the existing black roof system. Restoring the existing roofing system with new membrane coatings will extend the life of the current roof by 15 years delaying the need to re-roof the facilities.
3. CONSTRUCTION CONTRACT AWARD: The Director of Public Utilities pub...