header-left
File #: 1173-2005    Version: 1
Type: Ordinance Status: Passed
File created: 6/17/2005 In control: Utilities Committee
On agenda: 7/25/2005 Final action: 7/27/2005
Title: To authorize the Director of Public Utilities to enter into an agreement with BBS Corporation for professional engineering services in connection with the Jackson Pike Wastewater Treatment Plant Disinfection Chemical Handling Facility Improvements; to authorize the appropriation, transfer, and expenditure of $350,000.00 from the Sewer System Reserve Fund to the Ohio Water Pollution Control Loan Fund; for the Division of Sewerage and Drainage. ($350,000.00)
Attachments: 1. ORD1173-2005BBSawardinfo.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
7/27/20051 MAYOR Signed  Action details Meeting details
7/27/20051 CITY CLERK Attest  Action details Meeting details
7/25/20051 Columbus City Council ApprovedPass Action details Meeting details
7/25/20051 COUNCIL PRESIDENT Signed  Action details Meeting details
7/18/20051 Columbus City Council Read for the First Time  Action details Meeting details
7/7/20051 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
7/7/20051 Utilities Drafter Sent for Approval  Action details Meeting details
7/7/20051 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
7/7/20051 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
7/6/20051 Utilities Drafter Sent for Approval  Action details Meeting details
7/6/20051 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
7/5/20051 Auditor Reviewer Reviewed and Approved  Action details Meeting details
7/5/20051 CITY AUDITOR Reviewed and Approved  Action details Meeting details
7/5/20051 Auditor Reviewer Reviewed and Approved  Action details Meeting details
6/29/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/28/20051 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
6/27/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/27/20051 Finance Reviewer Reviewed and Approved  Action details Meeting details
6/24/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/24/20051 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
6/23/20051 Utilities Reviewer Sent for Approval  Action details Meeting details
6/22/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/21/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
6/20/20051 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation
1. BACKGROUND:
This legislation authorizes the Director of Public Utilities to enter into a contract with BBS Corporation for purposes of providing professional engineering services in connection with the Jackson Pike Wastewater Treatment Plant Disinfection Chemical Handling Facility Improvements.

This project will modify and renovate the existing plant effluent disinfection chemical storage and process feed facility to meet all chemical safety and fire codes, and provide sufficient on site chemical storage capacities.

In addition, specific improvements to the wastewater treatment plant have been identified in a study produced under the 2005 Wet Weather Management Plan. These improvements will expand the plants' capacity to accommodate higher flow rates during wet weather, and are a part of an overall program to reduce the occurrences of sewer system overflows mandated by the City's agreement with the State of Ohio (Consent Order). The portion of those improvements that fall in the immediate area of this project's work are a logical addition to the work of this project and include replacement of plant effluent pumps, addition of a plant effluent relief conduit, and enlargement of the chlorine contact tank effluent opening. These items are included in the scope of work for the proposed engineering contract. It should be noted that the current conclusions and recommendations of the 2005 Wet Weather Management Plan study are general and preliminary, and may be revised as additional study work continues.

2. PROPOSED CONTRACT: $350,000.00 (Preliminary Design)
The services to be provided under this contract are divided into three sequential steps: Preliminary Design, Detailed Design, and Services During Construction. This contract is proposed to be entered into for an amount estimated to be sufficient to initiate, and possibly complete, the Preliminary Design work. Subsequent work steps will be funded incrementally by contract modificati...

Click here for full text