File #: 2356-2012    Version: 1
Type: Ordinance Status: Passed
File created: 10/22/2012 In control: Public Utilities Committee
On agenda: 12/3/2012 Final action: 12/5/2012
Title: To authorize the Director of Public Utilities to modify and increase the professional engineering services agreement with Dynamix Engineering Ltd.; for the 910 Dublin Road and 3568 Indianola Avenue Building Improvements Project; and to authorize an expenditure up to $132,409.64 within the Water Works Enlargement Voted Bonds Fund. ($132,409.64)
Attachments: 1. ORD 2356-2012 Information, 2. ORD 2356-2012 Sub ID
Explanation
1. BACKGROUND: This Ordinance authorizes the Director of Public Utilities to modify and increase the professional engineering services agreement with Dynamix Engineering Ltd. for the 910 Dublin Road and 3568 Indianola Avenue Building Improvements Project, Division of Power and Water Contract No. 1145.
This project is for the evaluation and potential design of improvements to the Division of Power and Water's 910 Dublin Road Administrative Building and 3568 Indianola Avenue Building. The Building Improvements project is a three-step project.

Step One included assessments for the 910 Dublin Road and 3568 Indianola Avenue facilities.
Modification No. 1 (Step Two) included design services of the approved improvements for the 910 Dublin Road and 3568 Indianola Avenue facilities.
Modification No. 2 (current/Step Two) is for additional design services for the 910 Dublin Road administrative building to include detailed design to renovate the 910 Dublin Road garage and vehicle maintenance area to be CNG compliant (Compressed Natural Gas) for storage and maintenance of CNG vehicles. Design will include:
· modification to roof, skylights, walls doors and structural items as necessary for CNG compliance
· modification to HVAC systems to provide CNG compliant space
· modification of the boiler and piping systems to allow for additional heating hot water air handlers
· addition of natural gas detection and control system to monitor, alarm, and control the ventilation in the space
· modification of electrical systems in order to classify ceiling spaces per NFPA
· evaluation and design of generator equipment to comply with NFPA CNG requirements
· interlocking of overhead doors with the CNG detection system

Detailed design will include construction plans, specification, and bidding documents, as well as bidding and construction assistance.
1.1 Amount of additional funds to be expended: $132,409.64