File #: 0380-2006    Version:
Type: Ordinance Status: Passed
File created: 2/15/2006 In control: Utilities Committee
On agenda: 4/24/2006 Final action: 4/27/2006
Title: To authorize the Director of Public Utilities to modify the professional engineering services contract with URS Corporation for the Big Walnut Augmentation/Rickenbacker Interceptor Sewer Project; to authorize the appropriation and expenditure of $5,202,892.00 from the Ohio Water Pollution Control Loan Fund, for the Division of Sewerage and Drainage and to declare an emergency. ($5,202,892.00)
Attachments: 1. 0380-2006LegislationAttachment.pdf, 2. ORD0380-2006MAP.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
4/27/20062 ACTING CITY CLERK Attest  Action details Meeting details
4/26/20062 MAYOR Signed  Action details Meeting details
4/24/20061 Columbus City Council Amended to EmergencyPass Action details Meeting details
4/24/20061 Columbus City Council Approved as AmendedPass Action details Meeting details
4/24/20062 COUNCIL PRESIDENT Signed  Action details Meeting details
4/3/20061 Columbus City Council Read for the First Time  Action details Meeting details
3/16/20061 Utilities Drafter Sent for Approval  Action details Meeting details
3/16/20061 Auditor Reviewer Reviewed and Approved  Action details Meeting details
3/16/20061 CITY AUDITOR Reviewed and Approved  Action details Meeting details
3/16/20061 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
3/15/20061 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
3/15/20061 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
3/15/20061 City Clerk's Office Sent back for Clarification/Correction  Action details Meeting details
3/13/20061 Utilities Drafter Sent for Approval  Action details Meeting details
3/9/20061 Auditor Drafter Sent for Approval  Action details Meeting details
3/9/20061 Auditor Reviewer Reviewed and Approved  Action details Meeting details
3/9/20061 CITY AUDITOR Reviewed and Approved  Action details Meeting details
3/8/20061 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
3/8/20061 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
3/8/20061 Utilities Drafter Sent for Approval  Action details Meeting details
2/28/20061 Utilities Drafter Sent for Approval  Action details Meeting details
2/27/20061 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
2/27/20061 Utilities Drafter Sent for Approval  Action details Meeting details
2/27/20061 Finance Reviewer Reviewed and Approved  Action details Meeting details
2/27/20061 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
2/23/20061 Utilities Reviewer Sent for Approval  Action details Meeting details
2/22/20061 Utilities Drafter Sent for Approval  Action details Meeting details
2/22/20061 Utilities Reviewer Reviewed and Approved  Action details Meeting details
2/21/20061 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation
1. BACKGROUND:
This legislation authorizes modifying the professional engineering services contract with URS Corporation in connection with the Big Walnut Augmentation/Rickenbacker Interceptor Sewer Project.

This professional services contract was originally procured with a scope that included a multi-year renewable contract option for an entire scope of services. This provision allows the City to appropriate funds annually or on an as-needed basis depending upon the project's progress. This modification will fund services through March, 2007, and includes the engineering services during construction; materials testing; construction administration and inspection services for both Part 1 and Part 2 of the Project.

This project will construct in two parts. Part 1 will install a 168-inch diameter sanitary interceptor sewer from the Southerly Wastewater Treatment Plant to the Alum Creek Drive/State Route 317 intersection. Part 2 will construct a 144-inch diameter sanitary interceptor sewer from Alum Creek Drive/State Route 317 intersection north along Alum Creek Drive to the existing 108-inch Outfall Sewer. The included Shook Road connection will allow the removal of the Spiegel Road pump station and a 42-inch trunk sewer that will be constructed to service the Rickenbacker Port Authority and will allow for the removal of the present pump station.

2. PROFESSIONAL ENGINEERING SERVICES MOD. AWARD:
This contract is a multi-year contract that allows the City to appropriate funds on an as-need basis to cover the costs of services for a 12-18 month period, and it is necessary to fulfill the schedule and funding commitments for this project. This work is a planned, continuation of the services as originally included within the existing contract's scope of service. The contract total, including this modification is $22,008,377.00. It is also projected that modifications will be required in fiscal year 2007 based upon current project schedule...

Click here for full text