Skip to main content
header-left
File #: 3450-2025    Version: 1
Type: Ordinance Status: Second Reading
File created: 12/8/2025 In control: Public Utilities & Sustainability Committee
On agenda: 2/9/2026 Final action:
Title: To authorize the Director of the Department of Public Utilities to enter into a professional engineering services contract modification with Arcadis U.S. Inc., for the Southerly Wastewater Treatment Plant Variable Frequency Drives & Harmonic Filter Upgrade project; to authorize the appropriation of funds in the WPCLF Loan Fund; to make this ordinance contingent upon the Ohio Water Development Authority approving a loan for this project; and to authorize the expenditure of up to $1,415,543.62 from the WPCLF Loan Fund. ($1,415,543.62)
Indexes: WBE Participation
Attachments: 1. ORD 3450-2025 Utilization Schedule 2A-1, 2. ORD 3450-2025 Accounting Template, 3. ORD 3450-2025 SOS
Explanation

1. BACKGROUND
This ordinance authorizes the Director of Public Utilities to enter into a planned contract modification for professional engineering services during construction with Arcadis U.S. Inc., for the Southerly Wastewater Treatment Plant (SWWTP) Variable Frequency Drives (VFD) & Harmonic Filter Upgrade project, CIP #650346-100002, in an amount up to $1,415,453.62.

The City of Columbus, Department of Public Utilities’ (DPU) Division of Sewerage & Drainage, now known as the Division of Water Reclamation (DWR), has identified numerous VFDs and Harmonic Filters at SWWTP that are nearing the end of their useful service life and are becoming increasingly difficult to repair and maintain. These processes include the fine screens, Return Activated Sludge pumps, thickening centrifuges, and skimmings concentrators. This project will provide specialized professional engineering services to evaluate, replace, configure, and program the VFDs and harmonic filters, provide new controls that may be necessary to integrate the new equipment into the existing systems, and provide any other ancillary work to provide a fully functioning system. This work will also include recommendations for the standardization of equipment that can be used in the DWR Guide Specifications and programming of Programmable Logic Controllers. The equipment specified will vary based on site conditions, building use, building permit requirements, and ease of maintenance issues. Consideration shall be given to increasing ease of maintenance, development of standardized operating systems, and specifying control systems access software. This work is part of the City’s continuing effort to upgrade its treatment facilities, provide efficient, reliable, cost-effective operations, and enhance personnel safety.

The contract provides professional engineering services necessary for the entire project including preliminary design, detailed design, services for constru...