Title: To authorize the Director of Public Utilities to enter into a professional engineering services contract with the Ribway Engineering Group, Inc., in connection with the Fulton/Mound/Noble Sewer Rehabilitation Project; to authorize the expenditure of $375,867.00 from the Voted Sanitary Bond Fund; for the Division of Sewerage and Drainage. ($375,867.00)
Attachments: 1. ORD1492-2006MAP.pdf, 2. ORD1492-2006LegislationInformation.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
9/20/20061 MAYOR Signed  Action details Meeting details
9/20/20061 CITY CLERK Attest  Action details Meeting details
9/18/20061 Columbus City Council Approved  Action details Meeting details
9/18/20061 COUNCIL PRESIDENT Signed  Action details Meeting details
9/11/20061 Columbus City Council Read for the First Time  Action details Meeting details
9/5/20061 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
8/31/20061 City Clerk's Office Sent back for Clarification/Correction  Action details Meeting details
8/30/20061 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
8/29/20061 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
8/29/20061 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
8/29/20061 Utilities Drafter Sent for Approval  Action details Meeting details
8/29/20061 Auditor Reviewer Reviewed and Approved  Action details Meeting details
8/29/20061 CITY AUDITOR Reviewed and Approved  Action details Meeting details
8/29/20061 Utilities Drafter Sent for Approval  Action details Meeting details
8/29/20061 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
8/28/20061 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
8/28/20061 Utilities Drafter Sent for Approval  Action details Meeting details
8/25/20061 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
8/25/20061 Utilities Drafter Sent for Approval  Action details Meeting details
8/25/20061 Finance Reviewer Reviewed and Approved  Action details Meeting details
8/25/20061 Finance Reviewer Reviewed and Approved  Action details Meeting details
8/24/20061 Utilities Reviewer Sent for Approval  Action details Meeting details
8/23/20061 Utilities Drafter Sent for Approval  Action details Meeting details
8/23/20061 Utilities Reviewer Reviewed and Approved  Action details Meeting details
8/22/20061 Utilities Drafter Sent for Approval  Action details Meeting details
1. BACKGROUND:
This legislation authorizes the Director of Public Utilities to enter into a professional engineering services contract with the Ribway Engineering Group, Inc. for the sanitary sewer project known as the Fulton/Mound/Noble Sewer Rehabilitation Project.

This contract will provide for the cleaning and televising the existing sewer, dye testing of structures, performing manhole inspections and evaluations; investigating the need for easements, performing field surveying, preparing a Design Report to document evaluations and recommendations, generating detailed construction plans and specifications, preparing site-specific maintenance of traffic plans, supplying all construction documents required for bidding, performing engineering services during construction, and preparing as-built drawings at the completion of the project.

2. PROCUREMENT INFORMATION:
The basis for selection of the chosen professional engineering services firm: The Division advertised Request for Statement of Qualifications (RFSQ's) for the subject services in the City Bulletin in accordance with the provisions of Section 329.13 of Columbus City Codes. Three firms were short-listed and were requested to submit technical proposals for this project. These proposals were reviewed and ranked by a Professional Engineering Services Selection Committee in order to determine the consultant best qualified to provide the services for this project. The Division of Sewerage and Drainage received technical proposals on December 5, 2005 from the Ribway Engineering Group; Fuller, Mossbarger, Scott ad May Engineers, Inc; and E.M.H&T. The committee ranked the proposals on quality and feasibility. After careful consideration, the committee recommended that the Ribway Engineering Group, Inc. be selected to provide the engineering services for these projects, for which the Director of Public Utilities has concurred.

3. FISCAL IMPACT:
This ordinance will utilize recently deposited bond...