File #: 1121-2005    Version: 1
Type: Ordinance Status: Passed
File created: 6/13/2005 In control: Utilities Committee
On agenda: 7/11/2005 Final action: 7/14/2005
Title: To authorize the Director of Public Utilities to modify the contract with ms consultants, inc., for Professional Engineering Services for the Hap Cremean Water Plant Lagoons Nos. 1, 2, and 3 Sludge Removal, for the Division of Water, and to authorize the expenditure of $850,556.01 from Waterworks Enlargement Voted 1991 Bonds Fund, and to declare an emergency. ($850,556.01)
Attachments: 1. HCWP_VicMap.pdf, 2. Information to be included in Contracting Legislation 05-046.pdf, 3. lagoon_mods_scope-061005.pdf, 4. Cost By Task.pdf, 5. RFP Evaluation.pdf, 6. mod cost by task.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
7/14/20051 ACTING CITY CLERK Attest  Action details Meeting details
7/13/20051 MAYOR Signed  Action details Meeting details
7/11/20051 Columbus City Council ApprovedPass Action details Meeting details
7/11/20051 COUNCIL PRESIDENT Signed  Action details Meeting details
6/22/20051 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
6/21/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/21/20051 Auditor Reviewer Reviewed and Approved  Action details Meeting details
6/21/20051 CITY AUDITOR Reviewed and Approved  Action details Meeting details
6/21/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/21/20051 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
6/20/20051 Finance Reviewer Reviewed and Approved  Action details Meeting details
6/20/20051 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
6/14/20051 EBOCO Reviewer Reviewed and Approved  Action details Meeting details
6/14/20051 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
6/14/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/13/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/13/20051 Utilities Reviewer Reviewed and Approved  Action details Meeting details
6/13/20051 Utilities Drafter Sent for Approval  Action details Meeting details
6/13/20051 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
6/13/20051 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: : Residual production, transportation and disposal of sludge is a continual part of the water treatment process. The lime softening sludge lagoons at the Hap Cremean Water Plant are necessary to provide storage for emergency situations, such as loss of pumping capabilities, and to allow for maintenance of basins and pumping equipment. At the start of this project, all three (3) lagoons were filled to capacity. Consequently, the integrity of the embankments around the lagoons had been compromised. This contract provides professional engineering services for geotechnical evaluation of the embankments, and for the design and preparation of contract documents for the physical removal of the sludge and improvements to the embankments. The original contract provided for engineering design for the first two phases of the sludge removal, construction administration services for the first phase of sludge removal, and geotechnical investigations. The construction work for the first phase of sludge removal has been substantially completed and the construction work for the second phase of sludge removal has been bid. This contract modification will provide for construction administration services for the second phase of sludge removal, engineering design and construction administration services for the third phase of the work which consists of embankment stabilization and earthen internal baffle construction, and additional geotechnical investigations.

CC 329.16 CONTRACT MODIFICATIONS:
1. Amount of additional funds to be expended under this modification: $850,556.01
2. The services identified to be included in this contract modification were identified in the original contract however costs for these services were not identified at that time. It was not possible to accurately estimate the costs to perform these tasks until the first phase of the work was completed.
3. The work under this contract modification is a continu...