Title: To authorize the Director of Public Utilities to modify and increase the professional engineering services contract with MS Consultants, Inc.; for the Parsons Avenue Water Plant Sludge Disposal Project; for the Division of Power and Water; and to authorize the expenditure of $459,908.00 from the Water Build America Bonds Fund. ($459,908.00)
Attachments: 1. ORD1688-2009 map.pdf, 2. ORD1688-2009 Legis. Info. Form.pdf, 3. ORD1688-2009 Subcontractor Info..pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
1/28/20101 CITY CLERK Attest  Action details Meeting details
1/27/20101 MAYOR Signed  Action details Meeting details
1/25/20101 Columbus City Council ApprovedPass Action details Meeting details
1/25/20101 COUNCIL PRESIDENT PRO-TEM Signed  Action details Meeting details
1/11/20101 Columbus City Council Read for the First Time  Action details Meeting details
12/9/20091 Utilities Drafter Sent for Approval  Action details Meeting details
12/9/20091 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
12/9/20091 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
12/8/20091 Auditor Reviewer Reviewed and Approved  Action details Meeting details
12/8/20091 CITY AUDITOR Reviewed and Approved  Action details Meeting details
12/8/20091 Utilities Drafter Sent for Approval  Action details Meeting details
12/8/20091 EBOCO Reviewer Sent for Approval  Action details Meeting details
12/8/20091 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
12/7/20091 Utilities Reviewer Sent for Approval  Action details Meeting details
12/7/20091 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
12/7/20091 Utilities Drafter Sent for Approval  Action details Meeting details
12/7/20091 Finance Reviewer Reviewed and Approved  Action details Meeting details
12/7/20091 Finance Reviewer Reviewed and Approved  Action details Meeting details
12/7/20091 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
12/7/20091 Utilities Drafter Sent for Approval  Action details Meeting details
12/4/20091 Utilities Drafter Sent for Approval  Action details Meeting details
12/4/20091 Utilities Reviewer Reviewed and Approved  Action details Meeting details
12/4/20091 Utilities Drafter Sent for Approval  Action details Meeting details
12/2/20091 Utilities Drafter Sent for Approval  Action details Meeting details
12/2/20091 Utilities Reviewer Reviewed and Approved  Action details Meeting details
12/2/20091 Utilities Reviewer Reviewed and Approved  Action details Meeting details
12/2/20091 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

BACKGROUND: This Ordinance authorizes the Director of Public Utilities to modify and increase the professional engineering services contract with MS Consultants, Inc. for the Parsons Avenue Water Plant (PAWP) Sludge Disposal Project, Division of Power and Water Contract No. 1118.

MS Consultants, Inc., Inc. was contracted by the City to provide site assessment of three existing sludge lagoons at the Parsons Avenue Water Plant (PAWP), prepare a written technical report summarizing the findings with proposed solutions, and provide bid drawings and specifications for the removal and disposal of the lime softening sludge from the lagoons. The original engineering contract anticipated sludge removal from all three lagoons as one construction contract. Due to limited sludge storage capacity available in the lagoons to allow for Parsons Avenue Water Plant to continue operating, the project was divided into two parts during the early stages of the design. Bid specification and drawings were prepared for the immediate removal and disposal of sludge from lagoon 2 before the completion of the technical design report. Preparation of the written technical report, bid drawings, and bid specification for Lagoon 1 and 3 are currently being performed and are now referenced as Part II of this project. The release of contingency funds for the original contract was authorized to cover the additional consultant services required to perform the project design in two parts.

During the Request for Proposals, it was the City's intent to have the Consulting/Engineering firm perform construction administration/construction inspection services and a supplementary site reconnaissance of interior piping and lagoon embankments as a contract modification. This was also indicated in the original authorizing legislation. This contract modification is for the construction services for Part I of the project (sludge removal from lagoon 2).