Title: To authorize the Director of Public Utilities to execute a planned contract modification to the professional services agreement with Chester Engineers, Inc. for the Southerly Wastewater Treatment Plant Corrosion Prevention and Protective Coating Systems; to transfer within and expend $471,558.66 from the Sanitary Sewer Build America Bond and amend the 2011 Capital Improvements Budget. ($471,558.66)
Attachments: 1. Sub-Contractor WIF 650350-100002 SWWTP Corrosion Prevention Protective Coating Consultant.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
5/12/20111 CITY CLERK Attest  Action details Meeting details
5/11/20111 MAYOR Signed  Action details Meeting details
5/9/20111 Columbus City Council ApprovedPass Action details Meeting details
5/9/20111 COUNCIL PRESIDENT Signed  Action details Meeting details
5/2/20111 Columbus City Council Read for the First Time  Action details Meeting details
4/19/20111 Utilities Drafter Sent for Approval  Action details Meeting details
4/19/20111 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
4/19/20111 Utilities Drafter Sent to Clerk's Office for Council  Action details Meeting details
4/18/20111 Utilities Drafter Sent for Approval  Action details Meeting details
4/18/20111 Auditor Reviewer Reviewed and Approved  Action details Meeting details
4/18/20111 CITY AUDITOR Reviewed and Approved  Action details Meeting details
4/15/20111 Finance Reviewer Reviewed and Approved  Action details Meeting details
4/15/20111 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
4/15/20111 Utilities Drafter Sent for Approval  Action details Meeting details
4/15/20111 EBOCO Reviewer Sent for Approval  Action details Meeting details
4/15/20111 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
4/14/20111 Finance Reviewer Reviewed and Approved  Action details Meeting details
4/14/20111 Finance Reviewer Reviewed and Approved  Action details Meeting details
4/13/20111 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
4/13/20111 Utilities Drafter Sent for Approval  Action details Meeting details
4/12/20111 Utilities Reviewer Sent for Approval  Action details Meeting details
4/11/20111 Utilities Reviewer Reviewed and Approved  Action details Meeting details
4/6/20111 Utilities Reviewer Reviewed and Approved  Action details Meeting details
4/6/20111 Utilities Drafter Sent for Approval  Action details Meeting details
4/4/20111 Utilities Drafter Sent for Approval  Action details Meeting details
4/1/20111 Utilities Reviewer Reviewed and Approved  Action details Meeting details
3/31/20111 Utilities Drafter Sent for Approval  Action details Meeting details
Explanation

1. Background: This legislation authorizes the Director of Public Utilities to modify the professional services agreement with Chester Engineers, Inc. for the Southerly Wastewater Treatment Plant Corrosion Prevention and Protective Coating Systems Consultant project, for the Division of Sewerage and Drainage. The Chester Engineers, Inc. modification amount requested under this ordinance is $471,558.66. The contract total including this modification is $970,600.33.

The proposed contract modification provides funding for additional Preliminary and Detailed Design tasks and funding for Services During Construction estimated to be needed for construction contract S80 Corrosion Prevention and Protective Coating Systems Phase 1. The Division has determined that these services cannot be performed by City personnel at this time, and has planned for the procurement of these services on a routine basis.

1.1. Amount of additional funds to be expended: $471,558.66
Original Contract $499,041.67
Proposed Modification No. 1 $471,558.66
CURRENT PROPOSED TOTAL $970,600.33

1.2. Reasons additional goods/services could not be foreseen:
The potential need for contract modifications was identified with the original contract legislation documents. During the detailed survey of the condition assessment, Primary Clarifier No. 10's collector mechanism was identified as inoperable due to corrosion and requires replacement. Design services would be required for a construction contract for this replacement. As the design work progressed, it was determined that the scope of the professional services would need to be increased to include Services During Construction for the construction contracts. These services by the Design Professional would assure the coatings were properly installed.

1.3. Reason other procurement processes are not used:
Due to the highly complex and technical nature of this wastewater trea...