File #: 0071-2010    Version: 1
Type: Ordinance Status: Passed
File created: 1/5/2010 In control: Public Service & Transportation Committee
On agenda: 4/5/2010 Final action: 4/6/2010
Title: To authorize Director of Public Service to execute a professional engineering services contract modification with EMH&T, in connection with the River South Roadway Improvements - Phase 2 Project; to authorize the transfer of cash and appropriation within the Streets and Highways G.O. Bonds Fund; to authorize the transfer of this cash to the Fed-State Highway Engineering Fund; to authorize the appropriation and expenditure of $56,392.80 from the Fed-State Highway Engineering Fund; to amend the 2009 Capital Improvements Budget; and to declare an emergency. ($56,392.80)
Attachments: 1. 0071-2010 river south phase 2 design mod Utilization Info.pdf
Date Ver.Action ByActionResultAction DetailsMeeting Details
4/6/20101 MAYOR Signed  Action details Meeting details
4/6/20101 CITY CLERK Attest  Action details Meeting details
4/5/20101 Columbus City Council ApprovedPass Action details Meeting details
4/5/20101 COUNCIL PRESIDENT Signed  Action details Meeting details
3/26/20101 CITY AUDITOR Reviewed and Approved  Action details Meeting details
3/26/20101 Service Drafter Sent to Clerk's Office for Council  Action details Meeting details
3/24/20101 Service Drafter Sent for Approval  Action details Meeting details
3/24/20101 Auditor Reviewer Reviewed and Approved  Action details Meeting details
3/23/20101 ODI DIRECTOR Reviewed and Approved  Action details Meeting details
3/23/20101 City Clerk's Office Sent back for Clarification/Correction  Action details Meeting details
3/23/20101 Service Drafter Sent for Approval  Action details Meeting details
3/23/20101 CITY ATTORNEY Reviewed and Approved  Action details Meeting details
3/22/20101 Service Drafter Sent for Approval  Action details Meeting details
3/19/20101 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
3/17/20101 UTILITIES DIRECTOR Reviewed and Approved  Action details Meeting details
3/17/20101 Service Drafter Sent for Approval  Action details Meeting details
3/17/20101 EBOCO Reviewer Sent for Approval  Action details Meeting details
3/16/20101 Utilities Drafter Sent for Approval  Action details Meeting details
3/16/20101 Utilities Reviewer Sent for Approval  Action details Meeting details
3/11/20101 Service Drafter Sent for Approval  Action details Meeting details
3/10/20101 Service Drafter Sent for Approval  Action details Meeting details
3/10/20101 Auditor Reviewer Reviewed and Approved  Action details Meeting details
3/10/20101 CITY AUDITOR Reviewed and Approved  Action details Meeting details
3/9/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
3/9/20101 FINANCE DIRECTOR Reviewed and Approved  Action details Meeting details
3/8/20101 Service Drafter Sent for Approval  Action details Meeting details
3/8/20101 SERVICE DIRECTOR Reviewed and Approved  Action details Meeting details
3/8/20101 Finance Reviewer Reviewed and Approved  Action details Meeting details
3/5/20101 Service Reviewer Reviewed and Approved  Action details Meeting details
1/6/20101 Service Drafter Sent for Approval  Action details Meeting details
Explanation
1. BACKGROUND
The Division of Sewerage and Drainage has an existing contract with Evans, Mechwart, Hambleton & Tilton, Inc. (EMH&T) for the design of the River South Roadway Improvements - Phase 2 Project. The Division of Sewerage and Drainage was the contracting agent for this project, but the project design includes roadway elements which were funded by the Department of Public Service in the contract legislation. This legislation authorizes the Director of Public Service to modify and increase this contract.

The purpose of this project is to reconstruct 0.21 miles of Front Street between Mound Street and Rich Street; reconstruct 0.20 miles of Rich Street between Civic Center Drive and High Street; reconstruct 0.23 miles of Main Street between Second Street and High Street; and widen and resurface 0.11 miles of Main Street between Second Street and Civic Center Drive. Improvements within the project limits include upgraded sidewalks with pedestrian crossing upgrades at intersections, landscaping, storm sewers, water lines, street lighting, and traffic control devices.

A contract modification is necessary to include engineering services during construction and the cost of miscellaneous additional scope changes through the contract completion date, estimated to be October 2011. Engineering related services during construction are covered in Task A17 of the Design Contract but additional funds will be needed. It is necessary to modify the existing design contract with EMH&T because they have the knowledge from the development of the drawings to address future design issues that arise on site during construction.

The City received up to five million dollars of OPWC funding and five and a half million dollars of ARRA funding in 2009. Because of this funding, it was necessary to change the design drawings to ODOT format, provide environmental documentation, submit design exceptions, and to hold several meetings with ODOT. These activi...